2017년 3월 4일 토요일

New Horikawa (Nagoya-shi)

New Horikawa (Nagoya-shi)

New Horikawa
New Horikawa December 14, 2006 photography
Than a memory bridge of Naka-ku, Nagoya-shi south direction
Water system The first class water system Shonai River
Classification The first-grade river
Extension 6.0 km
Altitude of the water source -- m
Mean flow quantity -- /s
Basin area 24.0 km²
Water source 堀留水処理 center
River mouth, junction HorikawaAichiNagoya-shiMinami-ku
Basin Aichi
I display a template

New Horikawa (しんほりかわ) is the first-grade river flowing through Nagoya-shi, Aichi. Because joining Horikawa draws water from the Shonai River, new Horikawa belongs to Shonai River water system, too.

Table of contents

Geography

The south cruises in the city along Shojingawa low land and, starting from 堀留水処理 center in Naka-ku, Nagoya-shi, Aichi, flows into Horikawa in Meiji, Minami-ku. The duct becomes the boundary of Naka-ku, Showa-ku, Atsuta-ku, Mizuho-ku, Minami-ku.

Local government of the basin

History

From Shojingawa to new Horikawa
Shojingawa (it does not occur) (said that this name was attached because a Shinto priest of Atsuta-jingu Shrine made ablutions in this river in the case of 祓 of Nagoshi of June in old days) which flowed through the Nagoya plateau [1] as the source in Imaike area had the rich quantity of water with many springs, but the land along a river which wound caused the flood once. A plan to repair as a canal in (1883) in 1883 was built to prevent the outbreak of this flood, and to assume it the navigation of the ship and a saucer of the sewerage treatment water, and I was changed in (1910) in 1910 by current land along a river. In the case of this change, the name new Horikawa was acquired. In addition, original Shojingawa is filled up in (1926) in 1926 and becomes extinct.
The present conditions
Under the influence of sedimentation of the sludge for many years, floating of the sludge is seen for the intense heat period in particular, and the bad smell is severe, too. This does not have a river flowing in, and this is because the whole area becomes the feeling tide area because it is dug a design from the junction department to the Atsuta Port to the most deep part in those days excavated as a canal as approximately horizontal.
The management authority of the river is transferred to Nagoya-shi (2007) from Aichi on April 1 in 2007 [2].

Bridge

One way called to north is set the left bank for the south the right bank from 堀留下水処理場 to a new rolling bridge, and, as it were, a form of the right-hand traffic has its road running on the both sides of new Horikawa stolen.

Footnote

  1. ^ "forming anew Atsuta cutting bridge story" P.33
  2. ^ Aichi Construction Department river section: About devolution to Nagoya-shi of the prefecture management river, it is September 25, 2014

References

  • Horio remains honoring society, Ubado cutting bridge preservation society "wish - 1976 of forming anew Atsuta cutting bridge story - mother"

Allied item

  • I was made with the earth and sand which appeared by digging of the Tsurumai Park - Niihori River.
  • The bridge which was in Shojingawa of cutting bridge - past

This article is taken from the Japanese Wikipedia New Horikawa (Nagoya-shi)

This article is distributed by cc-by-sa or GFDL license in accordance with the provisions of Wikipedia.

Wikipedia and Tranpedia does not guarantee the accuracy of this document. See our disclaimer for more information.

In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.

0 개의 댓글:

댓글 쓰기