2017년 2월 23일 목요일

Tokyo way, Kanagawa prefectural road 19 Machida Chofu Line

Tokyo way, Kanagawa prefectural road 19 Machida Chofu Line

Main country path
Japanese Route Sign Number 1.svgJapanese Route Sign Number 9.svg
Tokyo way 19 mark
Japanese Route Sign Number 1.svgJapanese Route Sign Number 9.svg
Kanagawa prefectural road 19 mark
Tokyo way 19 Machida Chofu Line
Kanagawa prefectural road 19 Machida Chofu Line
Route extension 20.6 km (true extension)
The starting point Okuramachi, Machida-shi, Tokyo
Terminal 1, Kojimacho, Chofu-shi, Tokyo
Is connected
Main road
Scale

Tokyo way 57 Okuramachi, Sagamihara Line
Tokyo way 18 Fuchu Machida Line
Tokyo way 9 Fuchu, Kawasaki Line
Tokyo way 12 Chofu Tanashi Line


Template ( notebook how to use ) Wiki project road
The Tama riverbank Bridge which links Inagi-shi to Chofu-shi

The Tokyo way, Kanagawa prefectural road 19 Machida Chofu Line (Tokyo and 19 ごうまちだちょうふせん which how about which how about, and kana does not distribute) is capital way to inform of National highway No. 20 of Machida-shi, Tokyo and Chofu-shi and a prefectural road (main country path). Most of sections are called Tsurukawa highway. The capital way belongs to Tama north and south road Route 1 (Chofu Hoya Line).

Table of contents

Summary

  • The starting point: Okuramachi, Machida-shi, Tokyo Tokyo way 18 Fuchu Machida Line point of intersection (flower intersection of the well)
  • A terminal: 1, Kojimacho, Chofu-shi, Tokyo National highway No. 20 point of intersection (Kojima-cho intersection)
  • Capital prefectural road authorization requirements: A road (road law Article 7 five) to inform of each main important area and national highway, national highway or last issue route (public road shown in road law Article 7 1-4) [the source required]
  • Route extension
    • Between East Kyoto Ward: 18,851m [1]
    • Between Kanagawa Ward: 1,796m (as of true extension, April 1, 2013) [2]
  • Area
    • Tokyo way: 403,766m2
    • Kanagawa prefectural road: 21,443m2

I it under an alias

Route situation

Bypass

  • Wakabadai, Inagi-shi, main line point of intersection (Wakabadai entrance intersection)
  • 5, Hijirigaoka, Tama-shi, Tokyo way 18 Fuchu Machida Line bypass point of intersection (Tama Isao Azuma garden intersection)
    Minamitama ridge main line
  • Momura, Inagi-shi, Kouyoudai Park street point of intersection (vertical Tando Ohashi intersection)
    ↓(approximately 450m) (on April 14, 2007 opening to traffic [3].)
  • Momura, Inagi-shi, Yamasaki Street point of intersection (south intersections in Inagi one)
    ↓(approximately 100m)
  • Momura, Inagi-shi, main line point of intersection (Inagi welfare center entrance intersection)
    ↓(approximately 200m)
  • Higashinaganuma, Inagi-shi, main line point of intersection (Inagi-shi government office west intersection)
  • Yanokuchi, Inagi-shi, Kawasaki Highway point of intersection (Yanokuchi intersection)

In addition, among roads along the Tama River intersecting near a Tama riverbank Bridge intersection of Chofu-shi, dozens of meters of east and west of the intersection is appointed to the branch line of this route.

Overlap section

Bridge

Geography

Road to intersect

Bypass

Local government to pass

It is important and the point of contact, the proximity point with means of transportation

 
A viaduct and a grade separation of Odakyu Tama Line. I photograph it from the northeast direction (October 26, 2008).

Other

 
Yanokuchi intersection. I photograph it towards a Tama riverbank Bridge direction from Inagi-shi (October 19, 2008). I intersect a viaduct of JR Nanbu Line.

Grade separation business of the neighborhood of JR Nanbu Line Yanokuchi Station [4] was completed (2005) on October 9 in 2005, and a railroad crossing was removed. In addition, the widening construction [5] from 2 traffic lanes of the Tama riverbank Bridge where I started from (1993) in 1993 to 4 traffic lanes was completed (2006) on April 23 in 2006. A chronic traffic jam of this neighborhood was in this way relieved. To the opening to traffic of the bridge, the south side was connected to the new street of the city planning road (Tama city planning road 3.1.6 Minamitama ridge main line) which followed Tama new subdivision from Yanokuchi.

Footnote

[Help]
  1. In ^ "Tokyo road present situation record 2013" Tokyo construction station road management section, January, 2014, it is page 80.
  2. It is page 12 "- (PDF) ^ in Kawasaki-shi construction green political situation road administration management section, November, 2013 as of Kawasaki-shi road statistics book - April 1, 2013". October 30, 2014 reading.
  3. ^ A traffic opening does approximately 0.4 kilometers of Tokyo construction station - Minamitama ridge main lines
  4. A railroad crossing of the neighborhood of ^ Tokyo construction station - JR Nanbu Line Yanokuchi Station disappears!
  5. It is a traffic opening with ^ Tokyo construction station - Machida Chofu Line (the 19th) Tsurukawa highway Tama riverbank Bridge

Allied item

This article is taken from the Japanese Wikipedia Tokyo way, Kanagawa prefectural road 19 Machida Chofu Line

This article is distributed by cc-by-sa or GFDL license in accordance with the provisions of Wikipedia.

Wikipedia and Tranpedia does not guarantee the accuracy of this document. See our disclaimer for more information.

In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.

0 개의 댓글:

댓글 쓰기