2017년 3월 17일 금요일

Shiga prefectural road, Kyoto way 3 Nango, Otsu Uji Line

Shiga prefectural road, Kyoto way 3 Nango, Otsu Uji Line

Main country path
Japanese Route Sign Number 3.svg
Shiga prefectural road 3 mark
Japanese Route Sign Number 3.svg
Kyoto way 3 mark
Shiga prefectural road 3 Nango, Otsu Uji Line
Kyoto way 3 Nango, Otsu Uji Line
Land section km
Marine section There is no designation
The establishment year (Shiga side) 1954
(Kyoto side) 1955
The starting point Otsu-shi, Shiga
Important
Way city
Ujitawara-cho
Terminal Uji-shi, Kyoto
Is connected
Main road
Scale

Japanese National Route Sign 0001.svgNational highway No. 1 (Japanese National Route Sign 0008.svgNational highway No. 8 overlap)
Shiga Prefectural Road 2
Japanese National Route Sign 0422.svgNational highway No. 422
京滋 bypass
Kyoto Prefectural Road 62
Kyoto Prefectural Road 15
Kyoto Prefectural Road 7





Template ( notebook how to use ) Wiki project road

Shiga prefectural road, Kyoto way 3 Nango, Otsu Uji Line (しがけんどう, きょうとふどう 3 ごうおおつなんごううじせん) is a main country path reaching the Uji, Uji-shi, Kyoto Bridge Nishizume point of intersection in the starting point at Otsu-shi, Shiga Matsubara national highway Exit point of intersection.

Table of contents

Summary

 
The neighborhood of Byodo-in Temple
I photograph it in Uji, Uji-shi, Kyoto tower river
 
The neighborhood of terminal
I photograph it for Uji, Uji-shi, Kyoto character wonder comfort
  • I am called "Uji River line" and am a drive course running in along Seta River - Uji River.
  • I was authorized (30 years) (1954) over March in 1955 from September in 1954, and the original route name was "Seta, Uji line".
  • It became the current route name (1972) from March in 1972, and, as for most of Otsu-shi sides, it was (56) in the overlap section with National highway No. 422 from April in 1981.
  • We have vehicle regulation in the summer.
    • Regulation section: Uji, Uji-shi Bridge, waiting for the evening bridge interval (Uji River line)
      • It is targeted for regulation: All two-wheeled vehicles
      • Regulation time: It is the / whole day in September from July
    • Regulation section: Uji-shi Amagase, waiting for the evening bridge interval
      • It is targeted for regulation: All two-wheeled vehicles
      • Regulation time: It is the / whole day on August 31 from July 20

Geography

Allied item

This article is taken from the Japanese Wikipedia Shiga prefectural road, Kyoto way 3 Nango, Otsu Uji Line

This article is distributed by cc-by-sa or GFDL license in accordance with the provisions of Wikipedia.

Wikipedia and Tranpedia does not guarantee the accuracy of this document. See our disclaimer for more information.

In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.

0 개의 댓글:

댓글 쓰기