Middle bunch fourth hydroelectric power station
A middle bunch fourth hydroelectric power station (なかぶさだいよんすいりょくはつでんしょ) is a hydroelectric power station of Chubu Electric Power.
Location
Summary
- A river: Middle bunch river
- Max power: 6,700kW
- Frequency: 50Hz
- Waterway type
- An effective head: 308.18m
- An operational start: It is December (1925) for 1,925 years
- Electric power company Azumino Electric of the Meiji era builds the power station.
Allied item
This article is taken from the Japanese Wikipedia Middle bunch fourth hydroelectric power station
This article is distributed by cc-by-sa or GFDL license in accordance with the provisions of Wikipedia.
In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.
0 개의 댓글:
댓글 쓰기