2017년 2월 3일 금요일

Oita prefectural road, Miyazaki prefectural road 7 Ogata Takachiho Line

Oita prefectural road, Miyazaki prefectural road 7 Ogata Takachiho Line

Japanese Route Sign Number 7.svg
Oita prefectural road 7 mark
Japanese Route Sign Number 7.svg
Miyazaki prefectural road 7 mark

Prefectural road, Miyazaki prefectural road 7 Ogata Takachiho Line (7 much ごうおがたたかちほせん where how about, and how is group conducting the religious service danger not to be good at) is a main country path of 54.6km in total length to reach Takachiho-cho, Nishiusuki-gun, Miyazaki from Bungo-Ono-shi, Oita considerably (prefectural road); [1].

Table of contents

Summary

It is the main country path which goes through Mount Sobo, Mount Katamuki with west prefectural road 8 Gokase, Taketa Line and prefectural road 6 Ume Hinokage line of the east, and binds Oita and Miyazaki together. There are waterfall of original buttocks and waterfall of roadside station original buttocks, Obirakozan, young people camping village, waterfall of Jokouji, upper part of a river Valley, Amano Iwato-jinja Shrine along the line.

Route data

  • The starting point: Ogatamachikamijizai, Bungoono-shi, Oita (= National highway No. 502 point of intersection)
  • A terminal: Mitai, Takachiho-cho, Nishiusuki-gun, Miyazaki
  • Route extension: 54.6 km

History

Intersection, road to be connected

Tunnel

  • 尾平越隧道
  • Akagawa tunnel
  • New Akagawa tunnel

Footnote

Allied item

This article is taken from the Japanese Wikipedia Oita prefectural road, Miyazaki prefectural road 7 Ogata Takachiho Line

This article is distributed by cc-by-sa or GFDL license in accordance with the provisions of Wikipedia.

Wikipedia and Tranpedia does not guarantee the accuracy of this document. See our disclaimer for more information.

In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.

0 개의 댓글:

댓글 쓰기