Xi'an subway Route 1
| Xi'an subway Route 1 | |
|---|---|
Wicket of Hokkaido University street Station | |
| Basic information | |
| Route network | Xi'an subway |
| The starting point | 後衛寨駅 |
| Terminal | Spinning castle Station |
| The number of the stations | 19 stations (after the extension opening of business 23 stations) |
| The opening of business | September 15, 2013 |
| Operator | Xi'an Metro limited liability Koji |
| Route structure | Basement |
| Route specifications | |
| Route distance | 25.4 km |
| Gauge of a track | 1,435mm (standard gauge) |
| The number of the tracks | Double track |
| Electrification method | Direct current1,500V Imaginary train line method |
| The maximum speed | 60km/h |
| Business section | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The route of the Xi'an subway that Xi'an subway Route 1 (the せいあんちかてつ 1 zhongwen notation which does not claim it: Xi'an place 铁1 线, English sentence notation: Xi'an Metro Line 1) links spinning castle Station from 後衛寨駅 of People's Republic of China Shaanxi Xi'an City. A line color is ■ blue.
Table of contents
Summary
By the route that ran through Xi'an City to the east and west, I made a trial on September 15, 2013 and was inaugurated [1]. In "Xi'an City castle town high speed orbit traffic line network plan" [authority of Xi'an City castle town high speed 轨 coming and going-based 设规划] of 2004, Route 1, the important main line of the north and south were done with Route 2 East-West important main lines. And, as an important route linking Xi'an north Station, an administrative central station, three development wards, Route 2 will be built earlier [2].
History
- A -1 sitting section (後衛寨駅 - spinning castle Station) starts construction on December 2, 2008.
- I announce the -1 sitting section station, a vehicle base, the name of the station on February 27, 2009.
- - tunnel penetrates on May 6, 2012.
- - trial run is inaugurated on September 15, 2013.
- -2 sittings section (Xianyang Shinrin-Koen Station - 後衛寨駅) starts construction on November 26, 2015.
Use vehicle
- Type B car six formation
| The correction of this knob is expected. |
List of stations
- The background color of the station name column is ■, and the station where a station name is displayed in an italic type character expresses that it is a station of non-opening of business.
| Station name | Station interval Kilometer | Total | Connection route, remarks | The location | |||
|---|---|---|---|---|---|---|---|
| Japanese | Simplified Chinese character Chinese | English | |||||
| Xianyang Shinrin-Koen Station | Lord of 咸 阳 forest 园 站 | Xianyang Senlin Gongyuan Xianyang Forest Park | Non-opening of business | Shaanxi Xi'an City | Mio ward | ||
| 澧 Eastern province Station | 沣 东 路站 | Fengdong Lu Fengdong Road | |||||
| Paths of Uebayashi Station | 上林路站 | Shanglin Lu Shanglin Road | |||||
| 張家村駅 | 张 家村站 | Zhangjiacun Zhangjia Village | |||||
| 後衛寨駅 | Empress 卫 寨站 | Houweizhai | 0.0 | 0.0 | |||
| Mitsuhashi station | Three 桥 站 | Sanqiao | |||||
| 皂河駅 | 皂河站 | Zaohe | |||||
| Jujube Sono Station | 枣 园 站 | Zayuan | Lianhu ward | ||||
| Han castle road Station | 汉 城路站 | Hangcheng Lu Hancheng Road | |||||
| Kaiyuan gate Station | 开 远门 站 | Kaiyuanmen | |||||
| Trouble movement road Station | 劳 动 路站 | Laodong Lu Laodong Road | |||||
| 玉祥門駅 | 玉祥 门 站 | Yuxiangmen | |||||
| 洒金橋駅 | 洒金 桥 站 | Sajinqiao | |||||
| Hokkaido University street Station | 北大街站 | Beida Jie North Street | ■Route 2 | ||||
| Paths of five Exit Station | 五路口站 | Wulukou | ■Route 4 (during a plan) | Xincheng District | |||
| Chaoyang gate Station | Morning 阳门 站 | Chaoyangmen | |||||
| 康復路駅 | 康 复 路站 | Kangfu Lu Kangfu Road | |||||
| Tonghua gate Station | Tonghua 门 站 | Tonghuamen | ■Route 3 | ||||
| Extreme longevity road Station | 万寿路站 | Wanshou Lu Wanshou Road | |||||
| 長楽坡駅 | 长 乐 坡站 | Changlepo | |||||
| 滻 River Station | 浐 河站 | Chanhe | 灞 Bridge ward | ||||
| Hanpa station | 半坡站 | Banpo | |||||
| Spinning castle Station | 纺 织 城站 | Fangzhicheng | ■Route 4 (during a plan) | ||||
Footnote
- ^ "Xi'an ground 铁 one 线15 day authority of original expression 车试运营" (September 14, 2013). September 16, 2013 reading.
- ^ Xi'an ground 铁 two 线设20 个 车 站全程 39 minutes 钟
Allied item
Outside link
- Xi'an Metro limited liability Koji (Chinese)
This article is taken from the Japanese Wikipedia Xi'an subway Route 1
This article is distributed by cc-by-sa or GFDL license in accordance with the provisions of Wikipedia.
In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.
0 개의 댓글:
댓글 쓰기