Information
Use StoreOfficeNursery schoolHouseParking lot
Designer Nikken housing system
Construction OBAYASHI CORPORATION
A building is important Sanko Real Estate
Management administration Kuwana made with a town Co., Ltd.
(third sector of Kuwana-shi)
Construction Steel frame steel reinforced concrete construction
Plottage

4,002.60

  • North hall: 2,083.29m2
  • South hall: 1,919.31m2 m²
Building area

3,493

  • North hall: 1,812m2
  • South hall: 1,681m2 m²
Deferred floor space

26,371.77

  • North hall: 11,477.85m2
  • South hall: 14,893.92m2 m²
Number of floors North hall: The eighth-floor the first floor above the ground under the ground
South hall: The 18th-floor the first floor above the ground under the ground
Height South hall: 60m
The number of houses 95 houses
Parking number

231

  • A store: 131
  • It is for houses: 100
The start of construction It is July (2004) for 2,004 years
The completion It is April (2006) for 2,006 years
Opening open It is April 28 (2006) for 2,006 years
The location 1-2, Soeicho, Kuwana-shi, Mie
Coordinate 35°4'N 0.8 seconds
136°41'E 7.2 seconds
Remarks A total business expense: 5,580 million yen
I display a template

サンファーレ (SUNFARE) is a commercial complex in a redevelopment district of Soeicho, Kuwana-shi, Mie.

Table of contents

Summary

I am located in Soeicho, Kuwana-shi, Mie. I practiced medicine (2006) on April 28 in 2006. The facilities share a part on ground the first floor and the second floor from the eighth-floor the first-floor north hall above the ground under the ground and south building on the 18th-floor the first floor above the ground under the ground [1]. Commercial facilities and a satellite office of Kuwana-shi enter the joint ownership part, and, as for the part on the third floor or above above the ground, parking lot, south hall become the condominium (95) north hall [1]. "サンファーレ" of the name is the coined word that put "ファーレ" (fare) meaning creation in "the sun" meaning Mie and the sun (Sun) and Italian together [1]. In addition, is the high-rise building in Mie when the south hall of 60m in height limits a use to an apartment [1]; [explanatory note 1].

Because the city area redevelopment business as the system rebuilt the redevelopment building which was built using the business although I am not used by the construction work of this サンファーレ, I am treated from promotion mechanism [3], redevelopment coordinator association [4], whole country cities, towns and villages redevelopment communication meeting [4] and each local government [5] [6] as "再々開発" in Ministry of Land, Infrastructure and Transport [2] and the city future.

In addition, it is done with first Japanese 再々開発事業 because it is earlier than "around Otaru station square third building district redevelopment" [7] completed for such a business in 2009. [8]. There was the commercial building "pal" which was ever constructed as part of Kuwana station square city area redevelopment business in the place where these facilities were located. The building starts a business in (1972) in 1972, and it has been the only large size commercial facility, and yearly turnovers exceed 10 billion yen, and the beginning of opening of business left the brisk results in those days in Kuwana-shi, but sales amount gradually decreases, and the achievements of Kuwana Shogyo Kaihatsu Co., Ltd. which is a management company turn worse [7]. The company applied for the peace conference in (1996) in 1996, and after that a nuclear tenant and a specialty store withdrew in succession, and the building was closed in (1997) in 1997 [7].

Because the building took the role as the facilities which connected Kuwana Station and the mall, and the centripetal force drop of the center city area was concerned about by closedown, I decided enforcement of the reproduction business by the public and private sectors combination in Kuwana-shi [7]. Because supercenter of アピタ Kuwana shop or Mycal Kuwana (existing Aeon Mall Kuwana) exists in Kuwana-shi, and center city area declined when enforcement of the reproduction business was decided, high demand switches the facilities use to the thing around the anticipated house [9] and will locate commerce, duties facilities only in the low-rise building region of the building [7]. For a business scheme, a financial institution abandoned a part of the credit of Kuwana Shogyo Kaihatsu, and Sanko Real Estate became driven by business, and a method to perform the purchase of land and the reservation floor and the dismantling of the building, the construction of new facilities throughout was adopted [8]. In addition, promoted enforcement in an early stage of the business [4], and former rightful claimant who hoped for the Kuwana chamber of commerce and a re-branch in commerce, duties facilities part on ground the first floor and the second floor as for the south building about the reservation floor did the house part on the third floor or above with the joint ownership by the division owner in a condominium and the thing that did it, and each homebuyer acquired in the ground, and ことで which Kuwana-shi acquired for 1,159 million yen as for the north building that utilized center city area commerce activation synthesis support project of Ministry of Economy, Trade and Industry, and maintained a municipal management parking lot [4] on all floors [9], burden on company decrease were planned by the utilization of the maintenance business such as buildings excellent for a framework of public support [8]; [10].

The construction work fails in the invitation of the food supermarket which it has not been dissolved, and the problem of the floor shape of the building which depth produces from the limitation of the site shape that there is not into long pieces to the north and south although I advanced smoothly assumed at first by such an action [11], and 40,000 and thing that there is not much per day are the neck [9], and the number of the passengers getting on and off of Kuwana Station will open 1 division as non-entering including for reaccession of former rightful claimant again in the commerce floors of 13 divisions [9].

Therefore when I utilized private companies after opening and pushed forward "space store measures", I wanted to do it, and [9] did not give an effect to the measures [12], and the drugstore chain cedar drugstore which was a nuclear tenant at the beginning of opening of business withdrew (2009) on February 22 in 2009 that did not pass from the opening of business adversely for three years either [13]. Because a private succeeding tenant did not enter it, HelloWork Kuwana enters it (2010) on March 8 in later 2010 more than one year [14] and canceled [15], a vacancy state, but the state generally difficult commercially called the commercial facilities which withdrew of the nuclear store and the done situation [16] continue afterwards.

History

  • - pal closes (1997) on July 31 in 1997.
  • The Kuwana establishment (Kuwana-shi, chamber of commerce other investments third sector) (2001) for 2,001 years made with - town Co., Ltd.
  • - Sanko Real Estate expresses industrialization (2002) in September in 2002.
  • I start - business plan decision, the dismantling of the existing building (2003) in 2003.
  • I start - building body construction (2004) in July in 2004.
  • - building body construction is completed (2006) in April in 2006.
  • I practice medicine (2006) as - サンファーレ on April 28 in 2006.

Main facilities

  • Kuwana-shi satellite office: I handle a part of the duties of the city on the night, Saturday and Sunday
  • Temporary child-care facility "さんさん room"
  • Kuwana-shi product tourist information center
  • Kuwana Chamber of Commerce
  • HelloWork Kuwana
  • Kuwana station square parking lot (95 accommodation) managed by Kuwana-shi

Traffic access

Allied item

Footnote

[Help]

Explanatory note

  1. In all buildings in ^ Mie, Minato, Yokkaichi port building is the most expensive.

Source

  1. ^ a b c d It is | about サンファーレ SUNFARE - サンファーレ -
  2. ^ "Representative land example - Kuwana station square redevelopment business to effectively utilize (サンファーレ)". Ministry of Land, Infrastructure and Transport land, construction industry station land market section. January 10, 2012 reading.
  3. ^ city みらい communication No. 238 2006.11 month issue (Report). City みらい promotion mechanism. (2006). http://www.toshimirai.jp/ifudletterpdf/200611.pdf. 
  4. ^ a b c d "Cities, towns and villages redevelopment communication meeting 41st redevelopment private supplementary schools of the whole country". National cities, towns and villages redevelopment communication meeting. January 10, 2012 reading.
  5. ^ Inspection report  administrative in  Nagaoka-shi assembly 2008 (Report). Nagaoka-shi assembly. (2008). http://www.city.nagaoka.niigata.jp/sigikai/sisatu/h20houkoku.pdf. 
  6. It is (Report). so ^ in news from assembly September, 2010 Soja-shi assembly. (2010). http://www.gikai.city.soja.okayama.jp/html/pdf/tayori/22_9/7_642KB.pdf. 
  7. ^ a b c d e "Re-maintenance casebook p.11 of the redevelopment building"
  8. ^ a b c "I ask about a summary of 再々開発事業 in front of question 2 Kuwana Station.". Kuwana-shi city maintenance director Masami Ishikawa "process and problem of 再々開発." Ministry of Land, Infrastructure and Transport. February 15, 2012 reading.
  9. ^ a b c d e "" face fresh start composition facilities "サンファーレ" 28th opening "in front of JR Kuwana Station." Chunichi Shimbunsha (Chunichi Shimbunsha). (April 25, 2006) 
  10. ^ "re-maintenance casebook p.12 of the redevelopment building"
  11. ^ geo-cube report Vol.33(Report). A company geo-Japanese red pine. (2007-1). http://www.geo-akamatsu.co.jp/g-c-r/pdf/gcr33.pdf. 
  12. ^ "サンファーレ"…Inspection report (Report). administrative in  Nagaoka-shi assembly 2008 when the commercial facilities become vacant now, and we had a store Nagaoka-shi assembly. (2008). http://www.city.nagaoka.niigata.jp/sigikai/sisatu/h20houkoku.pdf. 
  13. ^ News  about the  February, 2009 degree monthly flash report (Report). It is http://www.drug-sugi.co.jp/hd/ir/getsuji/pdf/news20090310.pdf. a cedar drugstore 
  14. "I am going to move ^ to Kuwana-shi assembly HelloWork, the station square building in the beginning of March, next year". Ise newspaper (Ise newspaper publisher). (December 17, 2009) 
  15. ^ "HelloWork Kuwana move." Inabe-shi information magazine Link April, 2010 issue (2010 vol.76) (Inabe-shi) (2010-3). 
  16. As for "other tenants, it is gradually generally said to tooth omission, it is ^ without it being difficult to look for the successor, and consisting as SC without a nuclear store when a nuclear store falls out". "The landlord who inside Enterprise 379th shutter commercial facilities increase rapidly, and is afraid of - general merchandise store withdrawal." Weekly diamond January 14, 2011 issue (Daiyamondosha) (2011-1). 

References

Outside link

This article is taken from the Japanese Wikipedia サンファーレ

This article is distributed by cc-by-sa or GFDL license in accordance with the provisions of Wikipedia.

Wikipedia and Tranpedia does not guarantee the accuracy of this document. See our disclaimer for more information.

In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.

0 개의 댓글:

댓글 쓰기