Gifu prefectural road, Nagano prefectural road 6 Tadachi, Nakatsugawa Line
The Gifu prefectural road, Nagano prefectural road 6 Tadachi, Nakatsugawa Line (ぎふけんどう, ながのけんどう 6 ごうなかつがわただちせん) is the general prefectural road that links Tadachi, Nagiso-machi, Kiso-gun, Nagano to Nakatsugawa-shi, Gifu.
Table of contents
Summary
Route data
- Route authorization
- Area of the road
- The starting point: Nakatsugawa, Nakatsugawa-shi, Gifu (National highway No. 19 point of intersection)
- A terminal: Nagiso-machi, Kiso-gun, Nagano [3] (National highway No. 19 point of intersection)
- True extension distance: Gifu -km, Nagano 3.3169km [3]
- Road law Article 7 Clause 1 pertinence: 5 [4]
History
(Nagano area)
- It is August 1 (1959) for 1,959 years: Authorization of 長野県道犬帰中津川線.
- It is April 1 (1982) for 1,982 years: I appoint 犬帰中津川線 to main country path Nakatsugawa Yamaguchi Line [5].
- It is January 17 (1983) for 1,983 years: 長野県道犬帰中津川線 is changed to Nagano prefectural road 72 Nakatsugawa Yamaguchi Line.
- It is April 1 (1994) for 1,994 years: I change the route number from the 72nd to the sixth.
- It is February 13 (2005) for 2,005 years: Yamaguchimura, Kiso-gun is 越県合併 to Nakatsugawa-shi. I change the terminal from Yamaguchimura, Kiso-gun to Nakatsugawa-shi. (as for the notification February 10)
- It is December 24 (2010) for 2,010 years: Change the terminal from Nakatsugawa-shi, Gifu to Tadachi, Nagiso-machi, Kiso-gun, Nagano; and the route name from Nakatsugawa Yamaguchi Line to Tadachi, Nakatsugawa Line a change [6] [7].
Route situation
Because the change notification of the route terminal was not done former Yamaguchimura (existing Nakatsugawa-shi) of the Kisogawa left bank having been a terminal before by the improvement of the route of National highway No. 19 when a point of intersection of National highway No. 19 moved to Nagiso-machi of the Kisogawa right bank, the state that was different a public terminal and a substantial terminal continued, but, as for the disagreement, was dissolved by the notification of the route change in 2010 [6]; [7].
- From the Kitano, Nakatsugawa-shi intersection to the T-shaped road intersection of the ball storehouse Ohashi north side, an old road of National highway No. 257 before the Shiroyama Ohashi (Nakatsugawa toll road) completion (1984 (1984)) is appointed on this route.
- It has been paved the particularly narrow thing about the section around the Ochiai dam from the T-shaped road intersection of the ball storehouse Ohashi north side, and the traffic of the vehicle is possible, too.
- A part of the Kurose highway.
- It is a prefectural road running in along the right bank of the river to form this National highway No. 19 and pair to run in the left bank of Kisogawa near by, but there is little traffic probably because part section narrow-mindedness part continues, and there are many non-improvement sections again [8].
Geography
Local government to pass
Footnote
- ^ Gifu notification 120th April 27, 2011 reading.
- ^ Nagano report 2228th Nagano notification 735th
- ^ a b Nagano road present situation 2011
- ^ Nagano road present situation 2000
- ^ 1982 Ministry of Construction notification 935th
- ^ a b Gifu notification 634th
- ^ a b Nagano notification 735th
- ^ Gifu notification 343rd April 27, 2011 reading.
Allied item
This article is taken from the Japanese Wikipedia Gifu prefectural road, Nagano prefectural road 6 Tadachi, Nakatsugawa Line
This article is distributed by cc-by-sa or GFDL license in accordance with the provisions of Wikipedia.
In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.
0 개의 댓글:
댓글 쓰기