Fangchenggang Nuclear Power Plant
Fangchenggang nuclear power plant (Chinese: Fangchenggang nucleus 电 站) is a nuclear power plant in People's Republic of China Guangxi チワン 族自治区防城港市港口区光坡鎮.
Fangchenggang Nuclear Power Plant | |
---|---|
Country | The People's Republic of China |
The location | Guangxi Zhuangzu Autonomous RegionFangchenggang CityChops ward光坡鎮 |
Coordinate | 21°40'N 108°34'E / 21.667 degrees N 108.567 degrees E ) coordinate: 21°40'N 108°34'E / 21.667 degrees N 108.567 degrees E ) |
The present situation | While driving |
The start of construction | July 30, 2010 |
Operator | Guangxi Fangchenggang nucleus electric Co., Ltd. |
Nuclear reactor | |
While driving | 1 x 1000 MW |
Under construction | 2 x 1000 MW |
Kind | 2 x CPR-1000 1 x HPR1000 |
Summary
The construction of the first first unit began on July 30, 2010. Two CPR-1000 type furnaces of the 1000MWe grade are going to be built with the first. The construction of the power station was approved for the beginning of the same month by the national development reform committee, and plans the construction of six nuclear reactors in total.
The construction of the second third unit began on December 24, 2015. An HPR1000 type furnace is adopted in the third unit.
The Guangxi Fangchenggang nucleus electric Co., Ltd. which is the joint venture of middle Kunihiro nuclear group and the Guangxi investment group performs the development [1]. In addition, the power station is at the position of around 50km from the Vietnamese border.
Nuclear reactor
Nuclear reactor | Nuclear reactor form | Quantity of net generation | Quantity of total generation | Construction start | The grid same period | Commercial driving | The driving end | Explanatory note |
---|---|---|---|---|---|---|---|---|
The first | ||||||||
The first unit (FANGCHENGGANG 1) | CPR-1000 | 1000 MWe | 1080 MWe | July 30, 2010 | October 25, 2015 | January 1, 2016 | [2] | |
The second unit (FANGCHENGGANG 2) | CPR-1000 | 1000 MWe | 1080 MWe | December 23, 2010 | 2015 (plan) | [3] | ||
Second period | ||||||||
The third unit (FANGCHENGGANG 3) | HPR1000 | 1000 MWe | 1150 MWe | December 24, 2015 | [4] | |||
The fourth unit (FANGCHENGGANG 4) | ||||||||
The fifth unit (FANGCHENGGANG 5) | ||||||||
The sixth unit (FANGCHENGGANG 6) |
Note
- ^ "Construction of Fangchenggang plant starts". World Nuclear News (July 30, 2010). July 21, 2013 reading.
- ^ "Nuclear Power Reactor Details - FANGCHENGGANG 1". Power Reactor Information System (PRIS). The International Atomic Energy Agency (IAEA) (March 6, 2016). March 8, 2016 reading.
- ^ "Nuclear Power Reactor Details - FANGCHENGGANG 2". Power Reactor Information System (PRIS). The International Atomic Energy Agency (IAEA) (March 6, 2016). July 21, 2013 reading.
- ^ "Nuclear Power Reactor Details - FANGCHENGGANG 3". Power Reactor Information System (PRIS). The International Atomic Energy Agency (IAEA) (March 6, 2016). March 8, 2016 reading.
This article is taken from the Japanese Wikipedia Fangchenggang Nuclear Power Plant