The appearance of the Sendai power station
Kind Thermal power station
Electric company Kyushu Electric Power
The location Japanese flag Japan
〒899-1924
Minatocho, Satsumasendai-shi, Kagoshima character China 6110-1

31°51'N 26.4 seconds 130°11'E 58.7 seconds / 31.857333 degrees N 130.199639 degrees E / 31.857333, a 130.199639 coordinate: 31°51'N 26.4 seconds 130°11'E 58.7 seconds / 31.857333 degrees N 130.199639 degrees E / 31.857333, 130.199639
The first unit
Electricity generating system Steam power generation
The output 500,000kW
Fuel Heavy oil
The commercial operation starting date July 2, 1974
The second unit
Electricity generating system Steam power generation
The output 500,000kW
Fuel Heavy oil
The commercial operation starting date September 27, 1985
An official site: Sendai power station
I display a template

Sendai power station (せんだいはつでんしょ) is an oil thermal power station of Kyushu Electric Power in Minatocho, Satsumasendai-shi, Kagoshima character China 6110-1.

Table of contents

Summary

The second unit started commercial operation the first unit in September, 1985 in July, 1974.

The second unit adopts DSS(Daily Start and Stop) method and stops in the night with a little electricity demand. LPG was used for fuel from environmental regulation at first, but use was canceled in 1991 by supply instability. A prevention of pollution agreement is revised with the abolition of LPG facilities in October, 2004 and is considered to be use of heavy oil [1].

I may be called like "Sendai thermal power station" or "Sendai heat" to distinguish it from Kawauchi Nuclear Power Plant in the same city, but the official name is "Sendai power station".

Remote driving watches large fog power station, Yamakawa power station and watches Koshikijima wind-power plant, the driving situation of the Cape Noma wind park power station.

A reservation is necessary, but can observe it.

Generation facilities

  • The total output: 1,000,000kW [2]
The first unit
The rating output: 500,000kW
Use fuel: Heavy oil
A commercial operation start: July 2, 1974
The second unit
The rating output: 500,000kW
Use fuel: Heavy oil
A commercial operation start: September 27, 1985

with the Kawauchi Nuclear Power Plant of relationships

The Sendai power station is built in the opposite side across Kawauchi Nuclear Power Plant and the Sendai River. Furthermore, the Sendai power station is almost built with Kawauchi Nuclear Power Plant for the same period. As for this, the doubt that might be because the Kawauchi Nuclear Power Plant shall include the fishery compensation agreement for the Sendai power station is held [3].

Source

  1. 34 pages of versions western on ^ "Nihon Keizai Shimbun" February 8, 1991
  2. ^ Kyushu Electric Power Sendai power station
  3. Shueisha Shueisha new book Satoshi Kamata that ^ "goes the nuclear power generation chain of islands"

Allied item

Outside link

This article is taken from the Japanese Wikipedia Sendai power station

This article is distributed by cc-by-sa or GFDL license in accordance with the provisions of Wikipedia.

Wikipedia and Tranpedia does not guarantee the accuracy of this document. See our disclaimer for more information.

In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.

0 개의 댓글:

댓글 쓰기