Fukuoka-shi subway Airport Line
Train (Meinohama Station) of Fukuoka-shi Traffic Bureau 2000 origin | |||
| Summary | |||
| Classification | Subway | ||
| Origin-destination | The starting point: Meinohama Station A terminal: Fukuoka-Airport Station | ||
| The number of the stations | 13 stations | ||
| Route sign | K | ||
| Administration | |||
| The opening of business | July 26, 1981 () | ||
| I extend for the last time | March 3, 1993 | ||
| Owner | |||
| Vehicle base | Meinohama vehicle base | ||
| Use vehicle | I refer to the melody of the vehicle | ||
| Route specifications | |||
| Route total extension | 13.1 km (8.1 mi) | ||
| Gauge of a track | 1,067 mm (3 ft 6 in) | ||
| Electrification | Direct current1,500 V Imaginary train line method | ||
| Service speed | A maximum of 75 km/h (47 mph) | ||
| Route number | Route 1 | ||
| |||
Airport Line (eat I do not do it this way) is the metro line which Fukuoka-shi Traffic Bureau linking Fukuoka-Airport Station of city Hakata-ku from Meinohama Station of Nishi-ku, Fukuoka-shi, Fukuoka runs. The route name by "the regulations about the setting of the Fukuoka-shi transportation project" Route 1, the route name of "railroad handbook" mention Route 1 (Airport Line). A line color is orange.
Table of contents
Summary
| Route map | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I go to the Fukuoka-shi center through a basement of Meiji Dori (municipal road Chiyo Imajuku Line, former National highway No. 202) from Nishi-ku Meinohama in western Fukuoka-shi, and Kamikawabatamachi, Hakata-ku greatly curves, and it reaches the Fukuoka Airport domestic airline terminal building basement via Hakata Station subjacency across a runway of Fukuoka Airport via National highway No. 3 basement through large Hiromichi り basement. I bind the downtown area, a newly developed city center, a traffic base of Fukuoka-shi including Meinohama, Nishijin, Tenjin, Nakasu, Hakata, Fukuoka Airport together in one, and it is arterial one binding east and west of Fukuoka-shi together.
It is a metro line running in it directly alone to an airport in Japan [1]. I perform Kyushu Railway Co. (Kyushu Railway Company) Chikuhi Line and mutual extension operation.
In addition, first Japanese autocratic driving is performed for a subway from 1984 when it is the opening of business fourth year and an entry of driver, a conductor [2] boards it from Kyushu Railway Company and it is hand-operated and carries out automatic driving by the ATO by all trains except the use of traveled 103 system 1500th level train.
A platform door (product made in Mitsubishi Electric [3]) was installed in all stations from 2003 through 2004, the following day. Opening width has its thing installed in the station of Airport Line stolen with 2,600mm widely whereas the opening width of the platform door installed in the station of Hakozaki Line and seven dark circles line of Fukuoka-shi Traffic Bureau is 2,100mm. This is a trace of what 103 system of the hand-operated driving ran in [4].
I may play a role as the alternative route between abolished JR Chikuhi Line Hakata Station - Meinohama Station, and passage communication transportation when I pass between Airport Line Meinohama Station - Hakata Station and take JR Line is set (cf. Fukuoka-shi Traffic Bureau # communication transportation).
Route data
- Route distance (working kilometer): 13.1km
- Gauge of a track: 1,067mm
- The number of the stations: 13 stations (I include an origin-destination station)
- Double track section: The whole line
- Electrification section: The whole line (direct current 1,500V)
- Block system: Signal type in the car
- The maximum speed: 75km/h
- Vehicle base: Meinohama vehicle base
- Section above the ground: Meinohama - Muromi interval
Service form
With the train communicating Hakozaki Line directly from train, Nakasu-Kawabata Station communicating JR Chikuhi Line directly other than a train of the service from Meinohama Station only in the inside the line between Fukuoka-Airport Station - Meinohama Station [5]. In space [6], the Nakasu-Kawabata Station - Nishijin Station (as for the morning and evening Meinohama Station) interval, it is almost almost traveled with space [7] for 3-5 minutes for 7-8 minutes at the Fukuoka-Airport Station - Meinohama Station interval. All trains perform autocrat driving after 2015.
- Train (Fukuoka-Airport Station - Meinohama Station interval) in the line
- It is operated four of them per about one hour in Airport Line. It is traveled with later Chikuhi Line through train almost in turn [6]. Is all sections consecutive service, but, only as for the last train from first train, Meinohama for Meinohama, it is the first train, last arrival basically Hakata Station [5]; [8] [9]. Unlike a Hakozaki Line through train, the train to turn down at Nishijin Station or Nakasu-Kawabata Station does not exist.
- Chikuhi Line through train
- It is operated four of them per about one hour in Airport Line. Of these, Fukuoka-Airport Station - Karatsu Station, Nishi-Karatsu Station interval, the remainder are operated one of them between Fukuoka-Airport Station - Chikuzen-Maebaru Station, Chikuzen-Fukae Station [6]. As a general rule, the train departing from and arriving at Nishi-Karatsu Station is usually operated only by vehicle of Kyushu Railway Company Karatsu Station, and both vehicles of Kyushu Railway Company, the Fukuoka-shi subway are used for the train departing from and arriving at Chikuzen-Fukae Station Chikuzen-Maebaru Station. But the vehicle of the Fukuoka-shi subway may introduce it as a pinch runner of the trains to Karatsu Station for a fixed period by the adjustment to assume the mileage of the position vehicle of special train or both equality [the source required]. There is the rapid train on the train departing from and arriving at Nishi-Karatsu Station Karatsu Station, too, but the subway inside the line stops at each station. All the entry of trains are departing from and arriving at Fukuoka-Airport Station, and there is not the way station lapel in the subway line.
- Hakozaki Line through train
- The half degree (four of them per about one hour) of the Hakozaki Line train runs in Airport Line [5] and is traveled in the daytime between Kaizuka Station - Nakasu-Kawabata Station - Nishijin Station between Kaizuka Station - Nakasu-Kawabata Station - Meinohama Station in [10], morning and evening [10].
Vehicle
Your station vehicle
|
Entry of vehicle
- Kyushu Railway Co. (Kyushu Railway Company)
A restroom in the car is established only for Kyushu Railway Company car. It was the only route where a restroom setting vehicle ran by Japanese subway until Odakyu Electric Railway 60000 form train "MSE" started commercial operation by Tokyo subway Chiyoda Line in March, 2008 [11]. The Kyushu Railway Company car is used only for a through train exclusively, and there is not the use only for subway inside the line.
|
Past entry of vehicle
- Kyushu Railway Company
- I run in it in 103 system 1500th level - March, 2015 and am finished
|
History
- It is July 26 (1981) for 1,981 years: Route 1 Muromi - Tenjin interval starts a business.
- It is April 20 (1982) for 1,982 years: Tenjin - Nakasu Kawabata interval starts a business.
- It is March 22 (1983) for 1,983 years: Meinohama - Muromi interval, Nakasu Kawabata - Hakata (provisionally) interval start a business. Japanese National Railways Chikuhi Line and a mutual extension operation start.
- It is January 20 (1984) for 1,984 years: I start the domestic first autocratic driving in Japan for a subway.
- It is March 3 (1985) for 1,985 years: Hakata (provisionally) - Hakata interval starts a business. This Hakata Station station is completed.
- It is April 1 (1987) for 1,987 years: With Japanese National Railways division and privatization, a direct point becomes Kyushu Railway Co. (Kyushu Railway Company).
- It is March 3 (1993) for 1,993 years: Hakata - Fukuoka Airport interval starts a business. There is a nickname of Airport Line.
- It is March 23 (2002) for 2,002 years: I move back the last train (23:29 → 0:00 from Fukuoka Airport) and extend the mutual direct sections of the vehicle of Fukuoka-shi Traffic Bureau with Chikuhi Line to Chikuzen-Fukae Station.
- It is March 13 (2004) for 2,004 years: By an in-service start at Meinohama Station, all station setting of the platform door is completed.
- It is March 7 (2009) for 2,009 years: A chip card is all stations which do not run already and introduces it.
- After 2014 (2014): Following seven dark circles line, Hakozaki Line, I start the private consignment of station duties sequentially by our route (plan). But, from the viewpoint of staff upbringing, 3 Meinohama, Tenjin, Hakata stations continue as a direct management station [12].
List of stations
- I am located in all station Fukuoka-shi, Fukuoka.
- All district under jurisdiction of shell mound Station stations except Nakasu-Kawabata Station that is jurisdiction are direct management stations.
- The Chikuhi Line high speed stops at each station in Airport Line.
- The origin of the emblem refers to a station article.
- The station numbering is introduced sequentially by the beginning of March, 2011.
| Station number | Station name | Working kilometer between the station | Total working kilometer | Connection route | Emblem | The location |
|---|---|---|---|---|---|---|
| K01 | Meinohama Station | - | 0.0 | Kyushu Railway Co.: Chikuhi Line (to Karatsu Line Nishi-Karatsu Station direct driving.as for the train of Fukuoka-shi Traffic Bureau to Chikuzen-Fukae Station) | Yacht | Nishi-ku |
| K02 | Muromi Station | 1.5 | 1.5 | Flow of the Muromi River | Sawara-ku | |
| K03 | Fujisaki Station | 0.8 | 2.3 | wisteria | ||
| K04 | Nishijin Station | 1.1 | 3.4 | Pencil, the pen which graphically designed "N" | ||
| K05 | Tojinmachi Station | 1.2 | 4.6 | Pot of the arabesque design | Chuo-ku | |
| K06 | Ohori-Koen Station | 0.8 | 5.4 | Cherry blossoms | ||
| K07 | Akasaka Station | 1.1 | 6.5 | The runner who graphically designed "a" | ||
| K08 | Tenjin Station | 0.8 | 7.3 | Fukuoka-shi subway: ■Seven dark circles line (I transfer via Tenjinminami Station Tenjin underground shopping center) Nishi-Nippon Railroad: Tenjin Omuta Line(Nishitetsu-Fukuoka(Tenjin) Station) | Flower (I express Tenjin) of the plum | |
| K09 H01 | Nakasu-Kawabata Station | 0.8 | 8.1 | Fukuoka-shi subway: ■Hakozaki Line (there is it directly from the Meinohama area) | Of "the inside" and "the river" graphically design | Hakata-ku |
| K10 | Gion Station | 1.0 | 9.1 | Youth of the Gion, Hakata sedge hat with ornaments | ||
| K11 | Hakata Station | 0.7 | 9.8 | Kyushu Railway Co.: West Japan Railway Co.: | Hakata presentation is likely | |
| K12 | Higashi-Hie Station | 1.2 | 11.0 | The pot which graphically designed "hi" | ||
| K13 | Fukuoka-Airport Station | 2.1 | 13.1 | An airplane and the sky |
- There is the commuter pass section in Meinohama, Nishijin, Tenjin, each station of Hakata. I can purchase the はやかけんでの commuter pass with a ticket vendor of all station setting, but can use the credit card only in the commuter pass section mentioned above.
Footnote
- ^ Toei Asakusa Line communicates Narita International Airport and Tokyo International Airport directly, too, but runs in it via a route of Keisei Electric Railway and Keikyu.
- In this case I board it, and a conductor works separately from the staff who the staff working as ^ normal driver drives, and works. In addition, there is not the conductor as the office organization in Fukuoka-shi Traffic Bureau. In other words, there is not the staff who is mainly in charge of conductor duties.
- ^ "Introduction example | Fukuoka-shi Traffic Bureau-like movable home fence of the visitor area business activities area of the corporation". Mitsubishi Electric. February 15, 2015 reading.
- ^ It is as a result of "study meeting about the maintenance promotion of the fourth platform door" (PDF) - Ministry of Land, Infrastructure and Transport Railway Bureau (May 25, 2011) December 4, 2014 reading
- ^ a b c Fukuoka-shi rapid transit railway business summary 2012 fifth driving (PDF) - Fukuoka-shi Traffic Bureau
- ^ a b c Fukuoka-Airport Station timetable (Meinohama, Karatsu area weekdays) - Fukuoka-shi Traffic Bureau
- ^ Nakasu-Kawabata Station timetable (Meinohama, Karatsu area weekdays) - Fukuoka-shi Traffic Bureau
- ^ Hakata Station timetable (Meinohama, Karatsu area weekdays) - Fukuoka-shi Traffic Bureau
- ^ Meinohama Station timetable (Fukuoka Airport, shell mound area weekdays) - Fukuoka-shi Traffic Bureau
- ^ a b Kaizuka Station timetable (Meinohama, Karatsu area weekdays) - Fukuoka-shi Traffic Bureau
- A route now only for a ^ commuting type vehicle.
- More than 90% of ^, Fukuoka-shi subway station duties private consignment to becoming it! ! (PDF) - Fukuoka-shi Traffic Bureau official web site, September 28, 2013 reading.
Allied item
This article is taken from the Japanese Wikipedia Fukuoka-shi subway Airport Line
This article is distributed by cc-by-sa or GFDL license in accordance with the provisions of Wikipedia.
In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.
0 개의 댓글:
댓글 쓰기