List according to the Japanese thermal power station unit
References and the source which I can inspect are not shown at all, or this article is insufficient. You add the source, and please cooperate with the reliability improvement of the article. (September, 2015) |
A list (にほんのかりょくはつでんしょゆにっとべついちらん) according to the Japanese thermal power station unit is a list of according to the unit thermal power stations put in the various parts of Japan.
Table of contents
Generation facilities while driving
Hokkaido
The location | Power station name | Unit name | Owner name | The rating output (MW) | Fuel | Generation Method | Temperature condition ・ Steam conditions | Commercial operation The starting date | Commercial operation End day | Thermal efficiency (LHV) | Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|
Kushiro-shi | Ombetsu power station | 1 gas turbine | Hokkaido Electric Power | 74 | Light oil | GT | May, 1978 | December, 2015 plan | Approximately 28% | ||
Kushiro-shi | Ombetsu power station | 2 gas turbine | Hokkaido Electric Power | 74 | Light oil | GT | May, 1978 | December, 2015 plan | Approximately 28% | ||
Tomakomai-shi | Tomakomai power station | The first unit | Hokkaido Electric Power | 250 | Heavy oil、Crude oil、Natural gas | Steam power | November, 1973 | Natural gas blend firing start November 17, 2009 | |||
Tomakomai-shi | Tomakomai power station | 2-27 machine | Hokkaido Electric Power | 1.03 | Light oil | Internal combustion power | July, 2012 | ||||
Tomakomai-shi | Tomakomai power station | 28-83 machine | Hokkaido Electric Power | 0.85 | Light oil | Internal combustion power | July, 2012 | ||||
Tomakomai-shi | Tomakomai combination thermal power station | The third unit | Hokkaido PE | 250 | Heavy oil | Steam power | April, 1974 | It supplies quantity of all generation to Hokkaido Electric Power | |||
Sunagawa-shi | Sunagawa power station | The third unit | Hokkaido Electric Power | 125 | Coal (domestic charcoal) | Steam power | June 10, 1977 | 37.41% | |||
Sunagawa-shi | Sunagawa power station | The fourth unit | Hokkaido Electric Power | 125 | Coal (domestic charcoal) | Steam power | May 20, 1982 | 39.16% | |||
Date-shi | Power station for show | The first unit | Hokkaido Electric Power | 350 | Heavy oil | Steam power | November, 1978 | ||||
Date-shi | Power station for show | The second unit | Hokkaido Electric Power | 350 | Heavy oil | Steam power | March, 1980 | ||||
Shiriuchi-cho, Kamiiso-gun | Shiriuchi power station | The first unit | Hokkaido Electric Power | 350 | Heavy oil | Steam power | December, 1983 | ||||
Shiriuchi-cho, Kamiiso-gun | Shiriuchi power station | The second unit | Hokkaido Electric Power | 350 | Heavy oil, cage circle John | Steam power | September, 1998 | ||||
Okushiri-cho, Okushiri-gun | Okushiri power station | The fifth unit | Hokkaido Electric Power | 0.75 | Heavy oil | Internal combustion power | July, 1977 | ||||
Okushiri-cho, Okushiri-gun | Okushiri power station | The sixth unit | Hokkaido Electric Power | 0.75 | Heavy oil | Internal combustion power | June, 1990 | ||||
Okushiri-cho, Okushiri-gun | Okushiri power station | The seventh unit | Hokkaido Electric Power | 1 | Heavy oil | Internal combustion power | April, 1997 | ||||
Okushiri-cho, Okushiri-gun | Okushiri power station | The eighth unit | Hokkaido Electric Power | 0.75 | Heavy oil | Internal combustion power | December 1, 2010 | ||||
Okushiri-cho, Okushiri-gun | Okushiri power station | The ninth unit | Hokkaido Electric Power | 0.75 | Heavy oil | Internal combustion power | November 28, 2013 | ||||
Naie-cho, Sorachi-gun | Naie power station | The first unit | Hokkaido Electric Power | 175 | Coal (domestic charcoal) | Steam power | May, 1968 | ||||
Naie-cho, Sorachi-gun | Naie power station | The second unit | Hokkaido Electric Power | 175 | Coal (domestic charcoal) | Steam power | February, 1970 | ||||
Haboro-cho, Tomamae-gun | Yagishiri power station | The second unit | Hokkaido Electric Power | 0.24 | Heavy oil | Internal combustion power | |||||
Haboro-cho, Tomamae-gun | Yagishiri power station | The third unit | Hokkaido Electric Power | 0.23 | Heavy oil | Internal combustion power | August, 1976 | ||||
Haboro-cho, Tomamae-gun | Yagishiri power station | The fourth unit | Hokkaido Electric Power | 0.4 | Heavy oil | Internal combustion power | June, 1992 | ||||
Haboro-cho, Tomamae-gun | Yagishiri power station | The fifth unit | Hokkaido Electric Power | 0.24 | Heavy oil | Internal combustion power | October 8, 2014 | ||||
Rebun-cho, Rebun-gun | Rebun power station | The third unit | Hokkaido Electric Power | 0.5 | Heavy oil | Internal combustion power | August, 1971 | ||||
Rebun-cho, Rebun-gun | Rebun power station | The fourth unit | Hokkaido Electric Power | 0.5 | Heavy oil | Internal combustion power | October, 1971 | ||||
Rebun-cho, Rebun-gun | Rebun power station | The sixth unit | Hokkaido Electric Power | 0.5 | Heavy oil | Internal combustion power | June, 1974 | ||||
Rebun-cho, Rebun-gun | Rebun power station | The seventh unit | Hokkaido Electric Power | 0.75 | Heavy oil | Internal combustion power | September, 1980 | ||||
Rebun-cho, Rebun-gun | Rebun power station | The eighth unit | Hokkaido Electric Power | 1.1 | Heavy oil | Internal combustion power | June, 1993 | ||||
Rebun-cho, Rebun-gun | Rebun power station | The ninth unit | Hokkaido Electric Power | 1.1 | Heavy oil | Internal combustion power | May, 1996 | ||||
Rishiri-cho, Rishiri-gun | Shoe-shaped ridge decoration power station | The first unit | Hokkaido Electric Power | Heavy oil | Internal combustion power | 1950 | |||||
Rishiri-cho, Rishiri-gun | Shoe-shaped ridge decoration power station | The fourth unit | Hokkaido Electric Power | 0.75 | Heavy oil | Internal combustion power | December, 1971 | ||||
Rishiri-cho, Rishiri-gun | Shoe-shaped ridge decoration power station | The fifth unit | Hokkaido Electric Power | 1.25 | Heavy oil | Internal combustion power | August, 1975 | ||||
Rishiri-cho, Rishiri-gun | Shoe-shaped ridge decoration power station | The sixth unit | Hokkaido Electric Power | 1.25 | Heavy oil | Internal combustion power | August, 1977 | ||||
Rishiri-cho, Rishiri-gun | Shoe-shaped ridge decoration power station | The seventh unit | Hokkaido Electric Power | 1.25 | Heavy oil | Internal combustion power | June, 1994 | ||||
Rishiri-cho, Rishiri-gun | Shoe-shaped ridge decoration power station | The eighth unit | Hokkaido Electric Power | 1.9 | Heavy oil | Internal combustion power | September, 1999 | ||||
Rishiri-cho, Rishiri-gun | Shoe-shaped ridge decoration power station | The ninth unit | Hokkaido Electric Power | 1.25 | Heavy oil | Internal combustion power | July, 2014 | ||||
Atsuma-cho, Yuufutsu-gun | Toma east Atsuma power station | The first unit | Hokkaido Electric Power | 350 | Coal | Steam power | October, 1980 | ||||
Atsuma-cho, Yuufutsu-gun | Toma east Atsuma power station | The second unit | Hokkaido Electric Power | 600 | Coal | Steam power | SC | October, 1985 | |||
Atsuma-cho, Yuufutsu-gun | Toma east Atsuma power station | The fourth unit | Hokkaido Electric Power | 700 | Coal | Steam power | USC | June, 2002 | |||
Abira-cho, Yuufutsu-gun | South Hayakita power station | 1-72 machine | Hokkaido Electric Power | 1.03 | Light oil | Internal combustion power | December, 2012 |
Aomori
The location | Power station name | Unit name | Owner name | The rating output (MW) | Fuel | Generation Method | Temperature condition ・ Steam conditions | Commercial operation The starting date | Commercial operation End day | Thermal efficiency (LHV) | Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|
Hachinohe-shi | Hachinohe thermal power station | The third unit | Tohoku Electric Power | 250 | Heavy oil, crude oil | Steam power | August, 1968 | ||||
Hachinohe-shi | Hachinohe thermal power station | The fifth unit | Tohoku Electric Power | 416 | LNG | Composition | 1,300 degrees Class C | August 6, 2014 | 55% |
Miyagi
The location | Power station name | Unit name | Owner name | The rating output (MW) | Fuel | Generation Method | Temperature condition ・ Steam conditions | Commercial operation The starting date | Commercial operation End day | Thermal efficiency (LHV) | Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|
Miyagino-ku, Sendai-shi | New Sendai thermal power station | The first unit | Tohoku Electric Power | 350 | Heavy oil | Steam power | August, 1971 | ||||
Shichigahama-machi, Miyagi-gun | Sendai thermal power station | The fourth unit | Tohoku Electric Power | 446 | LNG | Composition | 1,400 degrees Class C | July 29, 2010 | Approximately 58% |
Akita
The location | Power station name | Unit name | Owner name | The rating output (MW) | Fuel | Generation Method | Temperature condition ・ Steam conditions | Commercial operation The starting date | Commercial operation End day | Thermal efficiency (LHV) | Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|
Akita-shi | Akita thermal power station | The second unit | Tohoku Electric Power | 350 | Heavy oil, crude oil | Steam power | February, 1972 | ||||
Akita-shi | Akita thermal power station | The third unit | Tohoku Electric Power | 350 | Heavy oil, crude oil | Steam power | November, 1974 | ||||
Akita-shi | Akita thermal power station | The fourth unit | Tohoku Electric Power | 600 | Heavy oil, crude oil | Steam power | July, 1980 | ||||
Akita-shi | Akita thermal power station | The fifth unit | Tohoku Electric Power | 333 | Light oil | GT | June 22, 2012 | Approximately 36% | Urgent setting power supply | ||
Noshiro-shi | Noshiro thermal power station | The first unit | Tohoku Electric Power | 600 | Coal, quality of wood biomass | Steam power | SC | May, 1993 | 42% | ||
Noshiro-shi | Noshiro thermal power station | The second unit | Tohoku Electric Power | 600 | Coal, quality of wood biomass | Steam power | USC | December, 1994 | 43% |
Yamagata
The location | Power station name | Unit name | Owner name | The rating output (MW) | Fuel | Generation Method | Temperature condition ・ Steam conditions | Commercial operation The starting date | Commercial operation End day | Thermal efficiency (LHV) | Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|
Sakata-shi | SAKATA KYODO POWER place | The first unit | SAKATA KYODO POWER | 350 | Coal | Steam power | October 1, 1977 | I am switched in 1984 by 重油専焼 | |||
Sakata-shi | SAKATA KYODO POWER place | The second unit | SAKATA KYODO POWER | 350 | Coal, quality of wood biomass | Steam power | October 6, 1978 | I am switched in 1992 by 重油専焼 | |||
Sakata-shi | Tobishima thermal power station | The fifth unit | Tohoku Electric Power | 0.15 | Heavy oil | Internal combustion power | |||||
Sakata-shi | Tobishima thermal power station | The sixth unit | Tohoku Electric Power | 0.2 | Heavy oil | Internal combustion power | |||||
Sakata-shi | Tobishima thermal power station | The seventh unit | Tohoku Electric Power | 0.2 | Heavy oil | Internal combustion power | |||||
Sakata-shi | Tobishima thermal power station | The eighth unit | Tohoku Electric Power | 0.2 | Heavy oil | Internal combustion power |
Fukushima
The location | Power station name | Unit name | Owner name | The rating output (MW) | Fuel | Generation Method | Temperature condition ・ Steam conditions | Commercial operation The starting date | Commercial operation End day | Thermal efficiency (LHV) | Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|
Iwaki-shi | Nakoso power station | The sixth unit | JOBAN JOINT POWER | 175 | Heavy oil | Steam power | November 30, 1966 | After a long term project stop, it is April 21, 2012 resumption of operation | |||
Iwaki-shi | Nakoso power station | The seventh unit | JOBAN JOINT POWER | 250 | Coal, carbonization fuel, quality of wood biomass | Steam power | October 26, 1970 | ||||
Iwaki-shi | Nakoso power station | The eighth unit | JOBAN JOINT POWER | 600 | Coal, carbonization fuel, quality of wood biomass | Steam power | September 9, 1983 | ||||
Iwaki-shi | Nakoso power station | The ninth unit | JOBAN JOINT POWER | 600 | Coal, heavy oil, carbonization fuel, quality of wood biomass | Steam power | December 15, 1983 | ||||
Iwaki-shi | Nakoso power station | The tenth unit | JOBAN JOINT POWER | 250 | Coal | IGCC | 1,200 degrees Class C | April 1, 2013 | 42.4% | ||
Minamisoma-shi | Haramachi thermal power station | The first unit | Tohoku Electric Power | 1,000 | Coal (overseas charcoal), quality of wood biomass | Steam power | USC | July 11, 1997 | 44% | ||
Minamisoma-shi | Haramachi thermal power station | The second unit | Tohoku Electric Power | 1,000 | Coal (overseas charcoal), quality of wood biomass | Steam power | USC | July 3, 1998 | 44% | ||
Shinchi-machi, Soma-gun | Chinatown Area power station | The first unit | Soma combination thermal power generation | 1,000 | Coal | Steam power | SC | July, 1994 | 41.89% (HHV) | ||
Shinchi-machi, Soma-gun | Chinatown Area power station | The second unit | Soma combination thermal power generation | 1,000 | Coal | Steam power | SC | July, 1995 | 41.89% (HHV) |
Generation facilities during a plan during the construction
Hokkaido
The location | Power station name | Unit name | Owner name | The rating output (MW) | Fuel | Generation Method | Temperature condition ・ Steam conditions | Commercial operation The starting date | Commercial operation End day | Thermal efficiency (LHV) | Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|
Otaru-shi, Ishikari-shi | Gulf of Ishikari new port power station | The first unit | Hokkaido Electric Power | 569.4 | LNG | Composition | February, 2019 plan | ||||
Otaru-shi, Ishikari-shi | Gulf of Ishikari new port power station | The second unit | Hokkaido Electric Power | 569.4 | LNG | Composition | December, 2021 plan | ||||
Otaru-shi, Ishikari-shi | Gulf of Ishikari new port power station | The third unit | Hokkaido Electric Power | 569.4 | LNG | Composition | December, 2028 plan | ||||
Rishiri-cho, Rishiri-gun | Shoe-shaped ridge decoration power station | The tenth unit | Hokkaido Electric Power | 0.75 | Heavy oil | Internal combustion power | July, 2016 plan |
Miyagi
The location | Power station name | Unit name | Owner name | The rating output (MW) | Fuel | Generation Method | Temperature condition ・ Steam conditions | Commercial operation The starting date | Commercial operation End day | Thermal efficiency (LHV) | Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|
Miyagino-ku, Sendai-shi | New Sendai thermal power station | Series of 3 | Tohoku Electric Power | 980 | LNG | Composition | July, 2016 plan | More than 59% |
Akita
The location | Power station name | Unit name | Owner name | The rating output (MW) | Fuel | Generation Method | Temperature condition ・ Steam conditions | Commercial operation The starting date | Commercial operation End day | Thermal efficiency (LHV) | Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|
Akita-shi | Nippon Paper Industries Akita factory | Nippon Paper Industries | 112 | Coal, quality of wood biomass | Steam power | 2018 plan | |||||
Noshiro-shi | Noshiro thermal power station | The third unit | Tohoku Electric Power | 600 | Coal, quality of wood biomass | Steam power | USC | 2020 plan |
Fukushima
The location | Power station name | Unit name | Owner name | The rating output (MW) | Fuel | Generation Method | Temperature condition ・ Steam conditions | Commercial operation The starting date | Commercial operation End day | Thermal efficiency (LHV) | Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|
Iwaki-shi | Iwaki energy park | ABLE | 112 | Coal, quality of wood biomass | Steam power | Spring of 2018 plan |
The generation facilities that was abolished
Hokkaido
The location | Power station name | Unit name | Owner name | The rating output (MW) | Fuel | Generation Method | Temperature condition ・ Steam conditions | Commercial operation The starting date | Commercial operation End day | Thermal efficiency (LHV) | Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|
Kushiro-shi | Ombetsu power station | 3 gas turbine | Hokkaido Electric Power | 1 | Kerosene | GT | July 23, 2012 | October 16, 2012 | Urgent setting power supply | ||
Kushiro-shi | Ombetsu power station | 4 gas turbine | Hokkaido Electric Power | 1 | Kerosene | GT | July 23, 2012 | October 16, 2012 | Urgent setting power supply | ||
Tomakomai-shi | Tomakomai combination thermal power station | The first unit | Hokkaido PE | 250 | Heavy oil | Steam power | |||||
Tomakomai-shi | Tomakomai combination thermal power station | The second unit | Hokkaido PE | 250 | Heavy oil | Steam power | |||||
Sunagawa-shi | Sunagawa power station | The first unit | Hokkaido Electric Power | 35 | Coal (domestic charcoal) | Steam power | January, 1955 | 1982 | |||
Sunagawa-shi | Sunagawa power station | The second unit | Hokkaido Electric Power | 35 | Coal (domestic charcoal) | Steam power | November, 1958 | 1982 | |||
Okushiri-cho, Okushiri-gun | Okushiri power station | The first unit | Hokkaido Electric Power | 0.5 | Heavy oil | Internal combustion power | 1968 | August 1, 2013 | |||
Okushiri-cho, Okushiri-gun | Okushiri power station | The second unit | Hokkaido Electric Power | 0.5 | Heavy oil | Internal combustion power | September 1, 1967 | August 1, 2013 | |||
Okushiri-cho, Okushiri-gun | Okushiri power station | The third unit | Hokkaido Electric Power | 0.2 | Heavy oil | Internal combustion power | October, 1965 | August 1, 2010 | The former Okushiri first power station first unit | ||
Okushiri-cho, Okushiri-gun | Okushiri power station | The fourth unit | Hokkaido Electric Power | 0.5 | Heavy oil | Internal combustion power | 1970 | August 1, 2010 | |||
Haboro-cho, Tomamae-gun | Yagishiri power station | The first unit | Hokkaido Electric Power | 0.24 | Heavy oil | Internal combustion power | December, 1969 | July 1, 2014 | |||
Rishiri-cho, Rishiri-gun | Shoe-shaped ridge decoration power station | The second unit | Hokkaido Electric Power | 0.5 | Heavy oil | Internal combustion power | November, 1967 | April 1, 2014 | |||
Rishiri-cho, Rishiri-gun | Shoe-shaped ridge decoration power station | The third unit | Hokkaido Electric Power | 0.75 | Heavy oil | Internal combustion power | 1970 | April 1, 2014 | |||
Atsuma-cho, Yuufutsu-gun | Toma east Atsuma power station | The third unit | Hokkaido Electric Power | 85 | Coal | PFBC | March, 1998 | October, 2005 | 40.1% (HHV) |
Aomori
The location | Power station name | Unit name | Owner name | The rating output (MW) | Fuel | Generation Method | Temperature condition ・ Steam conditions | Commercial operation The starting date | Commercial operation End day | Thermal efficiency (LHV) | Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|
Hachinohe-shi | Hachinohe thermal power station | The first unit | Tohoku Electric Power | 75 | Coal | Steam power | June, 1958 | 1982 | |||
Hachinohe-shi | Hachinohe thermal power station | The second unit | Tohoku Electric Power | 75 | Coal | Steam power | October, 1958 | 1982 | |||
Hachinohe-shi | Hachinohe thermal power station | The fourth unit | Tohoku Electric Power | 250 | Heavy oil, crude oil | Steam power | August, 1972 | April 30, 2006 |
Miyagi
The location | Power station name | Unit name | Owner name | The rating output (MW) | Fuel | Generation Method | Temperature condition ・ Steam conditions | Commercial operation The starting date | Commercial operation End day | Thermal efficiency (LHV) | Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|
Miyagino-ku, Sendai-shi | New Sendai thermal power station | The second unit | Tohoku Electric Power | 600 | Heavy oil、Crude oil、LNG | Steam power | June, 1973 | October 31, 2011 | |||
Shichigahama-machi, Miyagi-gun | Sendai thermal power station | The first unit | Tohoku Electric Power | 175 | Coal, heavy oil | Steam power | October, 1959 | August, 2007 | |||
Shichigahama-machi, Miyagi-gun | Sendai thermal power station | The second unit | Tohoku Electric Power | 175 | Coal | Steam power | November, 1960 | August, 2007 | |||
Shichigahama-machi, Miyagi-gun | Sendai thermal power station | The third unit | Tohoku Electric Power | 175 | Coal | Steam power | June, 1962 | March, 2004 |
Akita
The location | Power station name | Unit name | Owner name | The rating output (MW) | Fuel | Generation Method | Temperature condition ・ Steam conditions | Commercial operation The starting date | Commercial operation End day | Thermal efficiency (LHV) | Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|
Akita-shi | Akita thermal power station | The first unit | Tohoku Electric Power | 350 | Heavy oil, crude oil | Steam power | August, 1970 | December 27, 2003 |
Yamagata
The location | Power station name | Unit name | Owner name | The rating output (MW) | Fuel | Generation Method | Temperature condition ・ Steam conditions | Commercial operation The starting date | Commercial operation End day | Thermal efficiency (LHV) | Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|
Sakata-shi | Tobishima thermal power station | The first unit | Tohoku Electric Power | Heavy oil | Internal combustion power | 1974 | |||||
Sakata-shi | Tobishima thermal power station | The second unit | Tohoku Electric Power | Heavy oil | Internal combustion power | 1974 | |||||
Sakata-shi | Tobishima thermal power station | The third unit | Tohoku Electric Power | 0.08 | Heavy oil | Internal combustion power | June, 1996 | ||||
Sakata-shi | Tobishima thermal power station | The fourth unit | Tohoku Electric Power | 0.15 | Heavy oil | Internal combustion power | April 14, 2008 |
This article is taken from the Japanese Wikipedia List according to the Japanese thermal power station unit