2016년 10월 26일 수요일

Takahama power station

Takahama power station

Takahama power station
Takahama power station (1, the second unit) [1]
Takahama power station (3, the fourth unit)

Takahama power station (たかはまはつでんしょ) is a nuclear power plant of Kansai Electric Power in Takahama-cho, Ooi-gun, Fukui. With the Takahama Nuclear Power Plant (たかはまげんしりょくはつでんしょ), Takahama Nuclear Power Plant (たかはまげんぱつ).

Table of contents

Generation facilities

Number Nuclear reactor form The rating electricity output The driving starting date The present situation
The first unit Pressurization water type light water reactor (PWR) 826,000kW 1974November 14 Under a periodic inspection
The second unit Pressurization water type light water reactor (PWR) 826,000kW November 14, 1975 Under a periodic inspection
The third unit Pressurization water type light water reactor (PWR) 870,000kW 1985January 17 Shutdown
The fourth unit Pressurization water type light water reactor (PWR) 870,000kW June 5, 1985 Shutdown

Process

  • Setting permission [2] for December 12, 1969 - Kansai Electric Power Takahama power station first unit
  • Setting permission [2] for November 25, 1970 - second unit
  • Commercial operation start [2] of November 14, 1974 - first unit
  • Commercial operation start [2] of November 14, 1975 - second unit
  • Setting permission [2] for the August 4, 1980 -3.4 machine
  • Commercial operation start [2] of April 17, 1984 - third unit
  • Commercial operation start [2] of October 11, 1984 - fourth unit
  • Load plutonium-uranium mixed oxide fuel in a nuclear reactor of - third unit in December, 2010; an adjustment startup (as for the details # "Pluthermal Plan")
  • I stop driving of the first unit for - periodic inspection on January 10, 2011 [3]
  • Commercial operation start (as for the details # "Pluthermal Plan") of the pluthermal in January 21, 2011 - third unit
  • I stop driving of the fourth unit for - periodic inspection on July 21, 2011 [3]
  • I stop driving of the second unit for - periodic inspection on November 25, 2011 [3]
  • I stop driving of the third unit for - periodic inspection on February 20, 2012 [3]
  • Provisional disposition application [4] for the suspension of the re-operation of the 3.4 machine by December 6, 2014 - inhabitants
  • - Nuclear Regulatory Commission started an examination book indicating having passed examination to become the precondition for stopping Takahama power station re-operation on February 12, 2015. This shows that I met a new regulation standard about the nuclear power generation of Kansai Electric Power having jurisdiction over Takahama power station. [5][6]
  • - Fukui District Court gave decision of the provisional disposition not to accept re-operation in Kansai Electric Power about the third unit and the fourth unit of the Takahama power station on April 14, 2015 [7].
  • In 異議審 which caught the formal objection of - Kansai Electric Power on December 24, 2015, Fukui District Court cancels re-operation suspension provisional disposition [8].
  • January 29, 2016 - third unit re-operation [9].
  • I start - third unit rating heat output constant driving on February 4, 2016 [10].
  • I start - third unit book case driving on February 26, 2016 [11]. Fourth unit re-operation [12].
  • February 29, 2016 - fourth unit emergency stop [13]. Since Mihama Nuclear Power Plant urgently stopped what the fourth unit urgently stopped by the thunderbolt to a power transmission line since Kyoto University blackout [14] of October 27, 1999 as Kansai Electric Power in November, 2008 [15].
  • - Otsu District Court gave decision of the provisional disposition to give Kansai Electric Power an order for a shutdown about the third unit and the fourth unit of the Takahama power station on March 9, 2016 [16].
  • I receive it and stop March 10, 2016 - provisional disposition the third unit [17].
  • The Nuclear Regulatory Commission admitted that I extended driving for up to 20 years about - first unit, the second unit unanimously on June 20, 2016. I pass examination by so-called superannuation nuclear power generation more than 40 years from construction and try that extension was admitted for the first time [18].

"Pluthermal Plan"

  • December 5, 2010
Kansai Electric Power announced that I completed a loading of the plutonium-uranium mixed oxide fuel in a nuclear reactor of the third unit [19].
  • December 25, 2010
I started adjustment driving of the third unit [20].
  • January 21, 2011
I started commercial operation of the pluthermal in the third unit [21].
  • February 20, 2012
I stop driving of the third unit for a periodic inspection [3].
  • January 29, 2016
The third unit operates with pluthermal again. As for the re-operation by the pluthermal driving, first [22].
  • January 31, 2016
Plutonium-uranium mixed oxide fuel is loaded by the fourth unit. I have never met the pluthermal driving in the fourth unit [23].

Past main trouble

Publicity work

Footnote

[Help]
  1. I make it based on ^ Ministry of Land, Infrastructure and Transport country image information (color aerial photo) (1975 photography)
  2. ^ a b c d e f g "Nuclear power plant summary "Kansai Electric Power Takahama power station"". Ena JIS. December 27, 2015 reading.
  3. ^ a b c d e "About the administration situation of the nuclear power plant". Press release. Kansai Electric Power (December 2, 2015). December 27, 2015 reading.
  4. ^ "Nuclear power generation re-operation suspension provisional disposition application inhabitants "Oi, Takahama risk". Fukui Shimbun-sha. (December 6, 2014). http://www.fukuishimbun.co.jp/localnews/npp_restart/58995.html December 27, 2015 reading. 
  5. ^ "Takahama Nuclear Power Plant, regulation committee to an examination book publication new standard pass the second case, the re-operation summer later". Sankei news (February 12, 2015). An original [broken link] archive as of February 12, 2015. February 12, 2015 reading.
  6. ^ "passes for the examination of the Takahama Nuclear Power Plant re-operation premise". NHK online (February 12, 2015). An original [broken link] archive as of February 12, 2015. February 12, 2015 reading.
  7. "Provisional disposition decision] not to accept ^ Takahama Nuclear Power Plant re-operation." NHK NEWS WEB (April 14, 2015). An original [broken link] archive as of April 14, 2015. April 14, 2015 reading.
  8. ^ "I cancel suspension provisional disposition to accept Fukui District Court, Takahama Nuclear Power Plant re-operation". Fukui Shimbun-sha. (December 24, 2015). http://www.fukuishimbun.co.jp/localnews/npp_restart/86223.html December 27, 2015 reading. 
  9. ^ "Kansai Electric Power, the Takahama Nuclear Power Plant third unit re-operation three years 11 months yellowtail". Asahi Shimbun digital. (January 29, 2016 20:05). http://www.asahi.com/articles/ASJ1T7JFTJ1TPLFA00W.html February 21, 2016 reading. 
  10. It is reading ^ "press release" on http://www.kepco.co.jp/corporate/pr/2016/0205_1j.html February 5, 2016. 
  11. It is reading ^ "press release" on http://www.kepco.co.jp/corporate/pr/2016/0226_8j.html February 26, 2016. 
  12. It is reading ^ "press release" on http://www.kepco.co.jp/corporate/pr/2016/0226_10j.html February 26, 2016. 
  13. ^ "The re-operation that the Takahama Nuclear Power Plant fourth unit urgently stops generator trouble". (February 29, 2016). http://www.asahi.com/articles/ASJ2Y4V5TJ2YPLFA008.html February 29, 2016 reading. 
  14. 155 pages of ^ "atomic energy citizen yearbook 2015" mentions
  15. ^ "The re-operation that the Takahama Nuclear Power Plant fourth unit urgently stops a transformer abnormality". Asahi Shimbun digital. (March 1, 2016 01:23). http://www.asahi.com/articles/ASJ2Y4V5TJ2YPLFA008.html March 1, 2016 reading. 
  16. ^ "Provisional disposition Otsu District Court first during driving suspension operation". The Mainichi Shimbun (March 9, 2016). March 18, 2016 reading.
  17. "Provisional disposition decision of the stop Otsu District Court receives the third unit" ^ and. The Mainichi Shimbun (March 11, 2016). March 18, 2016 reading.
  18. The reason why driving extension examination of the ^ "superannuation nuclear power generation was given top priority to, Kansai Electric Power, 1, Takahama, the second unit are" Orient economy online to operation with more than 40 years in
  19. About ^ "completion of the fuel loading work in the Takahama power station third unit." Press release. Kansai Electric Power (December 5, 2010). April 16, 2011 reading.
  20. About ^ "adjustment startup of the Takahama power station third unit." Press release. Kansai Electric Power (December 25, 2010). April 16, 2011 reading.
  21. About ^ "full-scale resumption of operation of the Takahama power station third unit." Press release. Kansai Electric Power (January 21, 2011). April 16, 2011 reading.
  22. ^ "Kansai Electric Power, the Takahama Nuclear Power Plant third unit re-operation three years 11 months yellowtail". Asahi Shimbun digital. (January 29, 2016 20:05). http://www.asahi.com/articles/ASJ1T7JFTJ1TPLFA00W.html February 21, 2016 reading. 
  23. ^ "157 loading start electricity to include four first pluthermal generation MOX new fuel in the Takahama Nuclear Power Plant fourth unit". Fukui Shimbun-sha. (February 01, 2016 08:11). http://news.goo.ne.jp/article/fukui/region/fukui-20160201082422981.html February 21, 2016 reading. 
  24. ^ "a British public corporation nuclear fuel production for the pluthermal I do not make dimensional measurement Ministry of International Trade and Industry investigation." NHK news. (September 14, 1999). When it produced nuclear fuel with plutonium which I received trust of "Kansai Electric Power, and a British nuclear fuel public corporation used for "pluthermal"...There is the thing which filled in imaginary numerical value for an inspection record..." 
  25. ^ "pluthermal fuel Takahama nuclear power generation turn British company, some examination without performing it past data diversion." The Sankei Shimbun Tokyo morning edition: p. One 1 synthesis. (September 15, 1999). "Kansai Electric Power...About generation using plutonium-uranium mixed oxide fuel for the pluthermal planning,...British atomic fuel company...But, I misappropriated past data without carrying out inspection decided with a part of the fuel for Takahama Nuclear Power Plant third unit..." 
  26. ^ "data injustice entry Takahama nuclear power generation use planned plutonium-uranium mixed oxide fuel" [Osaka]. The Asahi Shimbun Osaka evening paper: p. 1 1 all-out. (September 14, 1999). "...British atomic fuel company...But, about a part of the quality control data at the time of production such as the size of the pellet of the plutonium-uranium mixed oxide fuel preparing it, I filled in data with neglecting inspection..." 
  27. ^ "British BNFL, plutonium-uranium mixed oxide fuel production data doubt - Kansai Electric Power of forging it announcement for the Takahama third unit." A daily publication industry newspaper: p. 8. (September 15, 1999). "Kansai Electric Power is a British atomic fuel company for 14 days...But, it is the Takahama third unit...I announced that production data of the uranium-plutonium mixed oxide (MOX) fuel producing in business were suspected of having been forged....Examination of quality control...The doubt that I converted former data into without performing the external form dimensional measurement of the item. " 
  28. ^ "essence of the concealment of nuclear plant accident," it is p. 43.
  29. ^ Know the nickname of the " Takahama Nuclear Power Plant; is an atom, uranium…In the office penetration delicate ". SankeiBiz (Sankei biz). (April 27, 2013). http://www.sankeibiz.jp/business/news/130427/bsd1304271203008-n1.htm April 28, 2013 reading. 

References

Allied document

Outside link

This article is taken from the Japanese Wikipedia Takahama power station

This article is distributed by cc-by-sa or GFDL license in accordance with the provisions of Wikipedia.

Wikipedia and Tranpedia does not guarantee the accuracy of this document. See our disclaimer for more information.

In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.