2016년 10월 15일 토요일

Susami interchange

Susami interchange

Susami interchange
Position route The period group Expressway
IC number 38
Notation of the main line mark Japanese National Route Sign 0042.svgSusami
Distance from the starting point 29.9km (the south period Tanabe IC starting point)
Hiki River IC (6.2km)
(9.4km) Susami south IC
The general way which is connected Wakayama prefectural road 38 Koza, Susami Line
The in-service starting date It is August 30 (2015) for 2,015 years
The location 649-2621
Susami, Susami-cho, Nishimuro-gun, Wakayama (Susami) [1]
I display a template

Susami interchange (Susami interchange) is an interchange of the period group Expressway in Susami-cho, Nishimuro-gun, Wakayama.

What was set up (2012) as a regional activation interchange on April 20 in 2012 was decided [2]. The August 30, 2015 opening to traffic [3] [4].

Table of contents

Road

Road to be connected

History

In the Hiki River IC - Susami IC interval, the interchange established in Susami-cho was the longest at approximately 15km and the distance between interchanges of Kinki Expressway Kisei Line under construction only in town Esumi away from the center of the town until the setting of our IC was decided [1]. Therefore the town requested that installed an interchange in the center, and Wakayama made a plan based on this, and setting was decided on place, April 20, the same year when applied to Ministry of Land, Infrastructure and Transport for addition setting (2012) on April 4 in 2012 [1]; [2]. "I became hardened, and it was said our IC at first with west IC" "Susami IC" an interchange established in Esumi by the trace, but "I became hardened, and the interchange that "became hardened, and was installed in Esumi an IC" our IC was decided formally with south IC" so that the name was correct in the fact formally [4].

  • It is April 20 (2012) for 2,012 years: As a regional activation interchange, a connection admits it from Ministry of Land, Infrastructure and Transport [2].
  • It is May 28 (2015) for 2,015 years: I decide an IC name from "Susami west IC" (tentative name) formally in "Susami IC" [4].
  • It is August 30 (2015) for 2,015 years: I offer it open with the opening to traffic between the Shirahama IC - Susami south IC for south period and start [3].

Neighboring

Tollgate

For a new direct control method (free section), the tollgate is not installed.

Neighbor

Footnote

  1. ^ a b c "It is IC Kinki Expressway Kisei Line in the Susami-cho center". Kii Mimpo-sha (April 21, 2012). June 3, 2014 reading.
  2. ^ a b c "Addition of the interchange to a national highway (PDF)". The Ministry of Land, Infrastructure and Transport Kinki district maintenance station (April 20, 2012). June 3, 2014 reading.
  3. Shirahama IC - Susami south IC is inaugurated for south period on ^ a b period group Expressway (Tanabe - Susami) Sunday, August 30; for activation in ... sightseeing leisure expectation ... (PDF) (Kinki district maintenance station July 31, 2015 press release, same day reading)!
  4. Shirahama leads from Tanabe IC in July for ^ a b c Kinki Expressway Kisei Line (Tanabe - Susami) south period and is inaugurated, and a route name in expectation ..., an IC name read a big effect for publication .29 days on south river national highway office May 28, 2015 for decision - Ministry of Land, Infrastructure and Transport Kinki district maintenance station period in a tourist season in ... summer

Related story

Outside link

This article is taken from the Japanese Wikipedia Susami interchange

This article is distributed by cc-by-sa or GFDL license in accordance with the provisions of Wikipedia.

Wikipedia and Tranpedia does not guarantee the accuracy of this document. See our disclaimer for more information.

In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.

0 개의 댓글:

댓글 쓰기