Hanyu Station
Hanyu Station | |
---|---|
The east exit (October, 2012) | |
はにゅう Hanyū | |
The location | 1, Minami, Hanyu-shi, Saitama 1-62 |
Position company | TOBU Railway (the station details) Chichibu Railway (the station details) |
TOBU Railway, Chichibu Railway Hanyu Station wiring diagram | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Hanyu Station (はにゅうえき) is a TOBU Railway, Chichibu Railway station at 1, Minami, Hanyu-shi, Saitama.
Isesaki Line of TOBU Railway and Chichibu Main Line (Chichibu Line) of Chichibu Railway run in it and become the junction station.
Table of contents
Chronological table
- I practice medicine (1903) as a - TOBU Railway station on April 23 in 1903.
- - 北武鉄道 starts a business (1921) on April 1 in 1921.
- - 北武鉄道 merges with Chichibu Railway (1922) in August in 1922.
- Our - station - Kawamata interval is made a double track (1992) on September 21 in 1992, and a last arrival train starting from our station is abolished.
- - Hashigami station building service starts (2004) on October 22 in 2004 [1]. I separate a wicket of TOBU Railway and Chichibu Railway.
- 2006 (2006) two March 18 - TOBU Railway stations a 4 line.
- I introduce TI 07 station numbering into the - TOBU Railway station (2012) on March 17 in 2012.
- I introduce a departure melody into the - TOBU Railway station (2013) on March 26 in 2013.
Station structure
They have the Hashigami station building which served as a passage free to do east and west, and the wickets of both companies become separate. I used a wicket in common before at a jurisdiction TOBU Railway station, but, in the wicket of TOBU Railway and Chichibu Railway, it was separated from October 22 (2004) in 2004 by Hashigami station building completion. A men's and women's flush toilet is installed in the TOBU Railway wicket.
TOBU Railway
Tobu Hanyu Station | |
---|---|
はにゅう Hanyū | |
◄TI 06 Minamihanyu (3.1km) (4.3km) Kawamata TI 08► | |
Station number | □TI 07 |
Position company | TOBU Railway |
Position route | Isesaki Line |
Distance in kilometers | 66.2km (the Asakusa starting point) |
Telegram cable address | Splash |
Station structure | Station (station on a bridge) above the ground |
Home | Two 4 lines |
Vehicle ridership -Statistics year - | 7,336/day (I do not include a getting off visitor) -2015 - |
The getting on and off staff -Statistics year - | 14,664 people/day -2015 - |
The opening of business date | It is April 23 (1903) for 1,903 years |
Remarks | Duties trust station |
A station having island expression home two 4 line above the ground. It is the duties trust station by the Tobu station service. The station number is TI 07.
In the case of time schedule revision of March 18, a sidetrack (Platform 1) was founded (2006) 2006 by an upbound home and was changed so that the limited express "Ryo train which had already" shunted shunted till then at our station at Kawamata Station.
During Kawamata Station became the single line section across the Tonegawa bridge before, and a semi-express train of our station first train, last arrival was set a lot, but I decreased, and our station - Kawamata Station interval was made a double track in time schedule revision on September 21 in time schedule revision on August 9 (1992) (1988) in 1992 in 1988 by top and bottom 2 coming and going. With this, our semi-express train departing from and arriving at a station was abolished.
Through Chichibu Railway connected at our station, the inspection of the import of the new product vehicle and going up to Tokyo line vehicle and the forwarding for 転配 are performed.
Platform
Numbered wire | Route | Direction | Destination |
---|---|---|---|
1.2 | Isesaki Line | The up | Kuki, Tobudobutsukoemmae ・ Tobu Sky Tree line Kitasenju・The Tokyo Sky Tree・AsakusaThe area |
3.4 | Descent | Tatebayashi・Ashikaga-shi・OtaThe area |
Chichibu Railway
Chichibu Railway Hanyu Station | |
---|---|
はにゅう Hanyū | |
(1.2km) Nishihanyu► | |
Position company | Chichibu Railway |
Position route | ■Chichibu Main Line |
Distance in kilometers | 0.0km (the Hanyu starting point) |
Telegram cable address | Splash |
Station structure | Station (station on a bridge) above the ground |
Home | One 2 line |
Vehicle ridership -Statistics year - | 2,623/day (I do not include a getting off visitor) -2015 - |
The getting on and off staff -Statistics year - | 5,093 people/day -2015 - |
The opening of business date | It is April 1 (1921) for 1,921 years |
A station having island expression home one 2 line above the ground. It is a direct management station. I consigned station duties to TOBU Railway before a wicket is separated, but a station employee of Chichibu Railway is placed after separation.
1-3 numbered wire (current 2-4 numbered wire), Chichibu Railway were 4.5 numbered wire Tobu until a new platform (current Platform 1) of TOBU Railway was established. Because Chichibu Railway did not change it when Tobu changed raising of numbered wire after new home completion, two Platform 4 exists. I use a station name version of the design which followed JR East in our station platform.
Platform
Numbered wire | Route | Destination |
---|---|---|
4.5 | ■Chichibu Line | Gyoda-shi・Kumagaya・Yorii・Nagatoro・Chichibu・MitsumineguchiThe area |
Use situation
- The daily mean getting on and off staff of the TOBU Railway -2015 year is 14,664 people [2].
- The daily mean vehicle ridership of the Chichibu Railway -2015 year is 2,623 people [3].
- It is the second place next to Kumagaya Station at the Chichibu Main Line station (35 stations).
The change of the recent daily mean getting on and off, vehicle ridership is a street of the lists shown below.
The year | TOBU Railway | Chichibu Railway | ||
---|---|---|---|---|
Daily average The getting on and off staff [5] | Daily average Vehicle ridership | Daily average The getting on and off staff | Daily average Vehicle ridership | |
1998 (1998) | 14,378 | |||
1999 (1999) | 14,131 | 6,977 | 4,366 | 2,124 |
2000 (2000) | 14,046 | 6,942 | 4,386 | 2,107 |
2001 (2001) | 13,802 | 4,339 | 2,080 | |
2002 (2002) | 13,800 | 4,380 | 2,091 | |
2003 (2003) | 13,840 | 6,871 | 4,425 | 2,126 |
2004 (2004) | 13,985 | 6,989 | 4,552 | 2,234 |
2005 (2005) | 13,972 | 7,030 | 4,684 | 2,378 |
2006 (2006) | 14,034 | 7,044 | 4,697 | 2,394 |
2007 (2007) | 14,308 | 7,221 | 4,761 | 2,438 |
2008 (2008) | 14,488 | 7,318 | 4,992 | 2,542 |
2009 (2009) | 14,188 | 7,150 | 4,901 | 2,507 |
2010 (2010) | 14,229 | 7,159 | 4,943 | 2,527 |
2011 (2011) | 14,408 | 7,173 | 4,994 | 2,576 |
2012 (2012) | 14,840 | 7,371 | 5,146 | 2,635 |
2013 (2013) | 14,840 | 7,384 | 5,092 | 2,617 |
2014 (2014) | 14,588 | 7,273 | 5,173 | 2,659 |
2015 (2015) | 14,664 | 7,336 | 5,093 | 2,623 |
Around station
- Hanyu-shi government office
- Chuo, Hanyu-shi Park
- Hanyu-shi gymnasium
- Hanyu citizen plaza
- Hanyu-shi industry culture hall
- Work Hills Hanyu
- Hanyu municipal library, native district museum
- Chuo, Hanyu-shi public hall
- Hanyu post office
- National highway No. 122
- Saitama naivete junior college
- Saitama Prefectural Habu Senior High School
- Saitama Prefectural Hanyu first high school
- Saitama Prefectural Hanyu business high school
- There is a grave of model, Shuzo Kobayashi of the novel "country teacher" of-based fortune temple - Katai Tayama.
- Large Tenpaku Park (large Tenpaku Shinto shrine) - wisteria Festival is carried out.
- NSK Saitama factory
- Aeon Mall Hanyu
Route bus
Platform | System | The main way ground | Destination | Service company | Remarks |
---|---|---|---|---|---|
The Hanyu Station west exit | Aeon Mall Hanyu Line | Shimoiwase | Aeon Mall Hanyu | HEISEI ENTERPRISE | |
Kawamata, Shingo route | The Shimoshingo north, Shingo Station, Honkawamata, the Hanyu Station east exit | City hall | Meet, and meet; a bus | Weekdays service | |
Sakaemachi | |||||
Sukage, Iwase route | Minami-Hanyu Station, culture hall, the Hanyu Station east exit in Shimoshinjo | ||||
Miyata housing complex entrance | |||||
The Hanyu Station east exit | Kawamata, Shingo route | Honkawamata, Bessho, Shingo Station, the Hanyu Station west exit | |||
Sukage, Iwase route | The Hanyu Station west exit in culture hall, Minami-Hanyu Station, Shimoshinjo | ||||
Lever forest, Mita ヶ valley route | North bag meeting place, Minami-Hanyu Station, two wards of Mita ヶ valleys, the Hanyu Station east exit | ||||
North bag, two wards of Mita ヶ valleys, Minami-Hanyu Station, the Hanyu Station east exit | |||||
Well, village route | In front of Chuo Park entrance, well public hall, sky sport park, the Hanyu Station east exit | ||||
In front of grasshopper assembly room, sky sport park, well public hall, the Hanyu Station east exit | |||||
A route bus by TOBU Railway was operated, and the Hanyu garage was installed, too, but all were abolished once. In addition, a bus factory has been installed in the interval after the war in Hanyu at few time by TOBU Railway. I dealt with car inspection or large-scale repair about a bus vehicle of Tobu on a rare scale for the thing of the bus service company in Japan at the time. In addition, maintenance, the car inspection of a bus, the car vehicle in the Tobu group is gathered except a part now by the morning sun car maintenance of affiliates.
The next station
- TOBU Railway
- Isesaki Line
- ■It is some stops "Ryo a limited express already"
- ■Section express ・■ section semi-express ・■ normal
- Minami-Hanyu Station (TI 06) - Hanyu Station (TI 07) - Kawamata Station (TI 08)
- Chichibu Railway
- Chichibu Main Line
- Express "paths of Chichibu"
- Hanyu Station - Gyodashi Station
- Normal
- Hanyu Station - Nishi-Hanyu Station
- Express "paths of Chichibu"
Footnote
- ^ "railroad record book," it is "RAIL FAN" Vol. 52 first, meeting of the railroad friend, January, 2005 issue, page 22.
- ^ Tobu railroad station information (the getting on and off staff)
- ^ a b I calculate it than Saitama statistical yearbook
- ^ Saitama statistical yearbook - Saitama
- A lot of ^ report - Kanto traffic Advertising Council
Allied item
- List of railroad stations of Japan
- Saitama prefectural road 413 Hanyu station line - station square street
Outside link
This article is taken from the Japanese Wikipedia Hanyu Station
This article is distributed by cc-by-sa or GFDL license in accordance with the provisions of Wikipedia.
In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.
0 개의 댓글:
댓글 쓰기