2017년 4월 27일 목요일

Miyakawa water

Miyakawa water

The Aoo irrigation which I looked at from Nanaho Ohashi
Miyakawa water Aoo irrigation Administration Office (Ao, Odai-cho, Taki-gun)
Miyakawa water central dispatching office (1, Kawasaki, Ise-shi)

The Miyakawa water (みやがわようすい) is a generic name of the irrigation canal group for the irrigation of the Mie south group district that assumes Miyakawa a water source.

Table of contents

Summary

  • It was built as agriculture water business in the Miyakawa overall development business.
  • I draw water in Miyakawa basin of Odai-cho, Taki-gun and am supplied water to Odai-cho, Taki-gun, Taki-cho, Meiwa-cho, Tamaki-cho, Watarai-gun, farmland of Ise-shi.
  • Shortage of water of the Miyakawa down stream area dissolved, and the farm maintenance in the receive benefits area advanced, and it was in throughout the prefecture eminent advanced agriculture area.
  • A receive benefits area: 4,681ha (as of rice field 4,066ha, normal field 530ha, tree garden 85ha, March, 2003)

Main facilities

  • The waterway which state-run line - Ministry of Agriculture and Forestry (existing Ministry of Agriculture, Forestry and Fisheries) built and facilities
    • Movable dam for water intake in Aoo irrigation (あおとうしゅこう) - Ao, Odai-cho, Taki-gun
    • Irrigation canal to connect a Kasagi diverted water mechanic (Kasagi, Taki-cho, Taki-gun) to from headrace - Aoo irrigation
    • Irrigation canal to connect Ogimachi, Ise-shi to through Saiku adjustment reservoir (Ikemura, Meiwa-cho, Taki-gun) from a first main line waterway - Kasagi diverted water mechanic
    • Irrigation canal to connect Miyako, Tamaki-cho, Watarai-gun to from a second main line waterway - Kasagi diverted water mechanic
  • In a waterway and the facilities which line -3 folds prefecture under prefectural management built, I supply water from the state-run line to each place
  • In a waterway and the facilities which 団体営線 - Miyakawa water land improvement district built, I supply water from a state-run line and the line under prefectural management to each place

History

  • Agriculture water is incorporated in - Miyakawa overall development business (1951) in 1951.
  • - Miyakawa water land improvement district establishes it (1957) in 1957.
  • I start work of - government management headrace (1958) in 1958, and a groundbreaking ceremony of the Miyakawa water business is held.
  • I start work of - irrigation canal managed by a prefecture (1961) in 1961.
  • I start work of - Aoo irrigation, state-run main line waterway, 団体営用水路 (1962) in 1962.
  • - Aoo irrigation, a state-run headrace are completed (1964) in 1964.
  • - government management main line waterway is completed (1966) in 1966, and a completion type of the national enterprise is held.
  • - irrigation canal managed by a prefecture is completed (1976) in 1976.
  • - 団体営用水路 is completed (1982) in 1982, and the general ceremony for the completion of the Miyakawa water business is held.
  • A groundbreaking ceremony of the reclamation business is held (1995) for - government management Miyakawa water second period in 1995.
Opposition movement for the Miyakawa water
  • An opposite petition for the Miyakawa water was carried out from 1957 through 1965 in receive benefits planned local each place. "The agriculture water is enough under the present conditions, and the main reason does not need to pull Miya River water paying money of burden" is which "local allotment is too big". I concluded an agreement to perform compensation by the negotiations by Ministry of Agriculture and Forestry and the Miyakawa water land improvement district and saw an end in many areas.
Compensation for the river water level drop
  • I irrigated Enzacho, Ise-shi by the pumping from the Miyakawa main stream not a receive benefits area of the Miyakawa water, but the water level of the river fell by Miyakawa dam construction, and pumping was concerned about a further water level drop by the Aoo irrigation construction from the experience that got hard and demanded measures from the Ministry of Agriculture and Forestry in 1958. As a result of investigation by the Ministry of Agriculture and Forestry, I judged, "the water level drop in the dry season is unavoidable" and performed the compensation construction (1963 completion) of new pumping facilities.
Fishery compensation
  • In about 1957, it was petitioned the Ministry of Agriculture and Forestry the compensation demand for drops of fish catches by the Miyakawa water business from the fishermen's cooperative association of the Miyakawa river coast. Ministry of Agriculture and Forestry and the negotiations with the fishermen's cooperative association continued after this and the agreement of the compensation amount of money and a memorandum of the quantity of water restriction were exchanged in 1962 and were settled.
  • I perform the compensation for the cultured laver decrease in income for the fishermen's cooperative association of the Miyakawa river mouth.
State-run Miyakawa water second reclamation business
  • By lack of deterioration of the facilities such as irrigation canals and water, I repair waterway facilities from 1995.
  • The main contents develop land for the repair of a headrace, the main line waterway, the Saiku adjustment reservoir and are going to be completed in 2010.

Reference materials

  • "History of Miyakawa water" (March 25, 1986 publication, editing publication: Miya River water land improvement district)
  • "A summary of the Morimiya River water of the water soil village" (2008 publication, Miyakawa water land improvement district)

Allied item

Outside link

Footnote

This article is taken from the Japanese Wikipedia Miyakawa water

This article is distributed by cc-by-sa or GFDL license in accordance with the provisions of Wikipedia.

Wikipedia and Tranpedia does not guarantee the accuracy of this document. See our disclaimer for more information.

In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.

0 개의 댓글:

댓글 쓰기