Wu-hsi Station
Wu-hsi Station | |
---|---|
Wu-hsi Station station building | |
无 锡 Wuxi | |
The location | JiangsuWu-hsi CityChongan ward |
Position company | People's Republic of China train service department |
The jurisdiction railroad line station | The Shanghai railroad line station |
Class | Top prize station |
Position route | 京滬線, 滬寧都市間鉄道 |
Distance in kilometers | 1,337km (the Beijing starting point) |
Station structure | Station above the ground |
Home | One simple system home, island expression home three |
The opening of business date | 1906July 18 |
Wu-hsi Station | |
---|---|
Various notation | |
Chinese Traditional: | 無錫站 |
Simplified Chinese character: | 无 锡 站 |
拼 Sound: | WúxīZhàn |
Pronunciation: | ウーシーヂャン |
English sentence: | Wuxi Railway Station |
Wu-hsi Station (むしゃくえき) is the station which the Chinese Japanese National Railways Shanghai railroad line station located in the People's Republic of China Jiangsu Wu-hsi City Chongan ward interest source road has jurisdiction over. The annual passenger transportation volume is 21 million people. Was next to the north of the current station, and a platform of 滬寧都市間鉄道 was established [1]; [2] [3].
Table of contents
Position route
- Chinese Japanese National Railways
- 京滬線: From Beijing Station to 1,337km, Shanghai Station 126km [4].
- 滬寧都市間鉄道
Station structure
It was one simple system home, station of three island expression homes above the ground, but the new home becomes the use start with the opening of business of 滬寧都市間鉄道 of July 1, 2010, too.
Use situation
This station is a top prize 京滬線 station treating a traveler, freight, and, as of [5], April, 2010, more than 160 passenger trains arrive and depart including each classification every day [6].
History
- Practiced medicine - on July 18, 1906 [7]; [8].
- - new station building was completed on April 10, 1949 [8].
- - expanded waiting room Building was done in June, 1969 [8].
- -1 became the station on May 12, 1982 [8].
- - new station building was completed on January 5, 1989 [8].
- I performed beginning to use of - new freight handled facilities on January 18, 1989 [8].
- - new office work Building was completed on October 18, 1997 [8].
- I performed beginning to use of - new waiting room Building on July 13, 2000 [8].
- The remodeling of - station square was completed on September 28, 2002 [8].
- I performed beginning to use of - new ticket office on April 22, 2003 [8].
- I performed beginning to use of - expanded freight handled facilities on October 8, 2004 [8].
- I performed beginning to use of - soft seat waiting room which was expanded totally, and was remodeled on December 31, 2004 [8].
- Expansion remodeling construction of - station building south side before National Foundation Day of China was over in 2005 and made beginning to use [5].
- - 滬寧都市間鉄道 started a business on July 1, 2010 [9].
The next station
- Chinese Japanese National Railways
- 京滬線
- Wu-hsi north Station (元石塘湾駅) - Wu-hsi Station - Wu-hsi south Station
- 滬寧都市間鉄道
- Hyesan Station - Wu-hsi Station - Wu-hsi new ward Station
Source
Outside link
- Wu-hsi Station (simplified Chinese character Chinese)
- Wu-hsi instruction (Japanese)
Coordinate: 31°35'21" N 120°18'3" E / 31.58917 degrees N 120.30083 degrees E
This article is taken from the Japanese Wikipedia Wu-hsi Station
This article is distributed by cc-by-sa or GFDL license in accordance with the provisions of Wikipedia.
In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.
0 개의 댓글:
댓글 쓰기