Tsubata north bypass
| References and the source which I can inspect are not shown at all, or this article is insufficient. You add the source, and please cooperate with the reliability improvement of the article. (January, 2013) |
Tsubata north bypass (つばたきた bypass) is a bypass road of National highway No. 8 reaching town Funahashi from Kariyasu, Tsubata-machi, Kahoku-gun, Ishikawa.
Table of contents
Summary
- The starting point: Kariyasu, Tsubata-machi, Kahoku-gun, Ishikawa
- A terminal: Funabashi, Tsubata-machi, Kahoku-gun, Ishikawa
- Extension: 5.8km
- Road standard: The third kind first grade
- Design speed: 80km/h
- The number of the traffic lanes: 2 provisional traffic lanes (completion 4 traffic lane)
- Road manager: Ministry of Land, Infrastructure and Transport
Position of the connected bypass of relationships
(the Kyoto area) Kanazawa bypass - Tsubata bypass - Tsubata north bypass - くりから bypass (the Niigata area)
including the interchange
- The starting point side, bottom are terminal sides the upper part. A side downhill a side, the right side upbound the left side.
- The thing without the special mention of the route name is a town road.
| Facilities name | The connection route name | From Niigata (km) | |
|---|---|---|---|
| National highway No. 8(I am bypassed by a chestnut) | |||
| The Arthraxon hispidus north | Prefectural road 219 Okitsu Arthraxon hispidus line | Prefectural road 215 Morimoto Tsubata Line | |
| Kurami | Prefectural road 218 Azamidani Tsubata Line | ||
| 庄 | The Shinrinkoen area | ||
| Kamo IC | Prefectural road 59 Tsubata, Takamatsu Line(Hebei vertical section road) | ||
| Funahashi JCT | National highway No. 159(Tsubata bypass)Seven of them・HakuiThe area | - | |
| National highway No. 8(Tsubata bypass)Komatsu・KanazawaThe area | |||
History
- 1984: Industrialization.
- 1991: The construction start of construction.
- 1998April 29: I offer it open, and Tsubata, Tsubata-machi - 同町庄 0.8km starts. (2 provisional traffic lanes)
- 1999March 31: I offer it open, and Kurami, Tsubata-machi - town Tsubata 0.9km starts. (2 provisional traffic lanes)
- 2006March 25: I offer it open, and Kamo, Tsubata-machi - Funahashi JCT0.5km starts. (2 provisional traffic lanes)
- 2007March 17: I offer it open, and Syo, Tsubata-machi - town Kamo 1.7km starts. (2 provisional traffic lanes)
- 2008March 15: Kariyasu, Tsubata-machi - town Kurami 1.9km performs an in-service start (2 provisional traffic lanes), and the whole line is inaugurated.
Allied item
Outside link
This article is taken from the Japanese Wikipedia Tsubata north bypass
This article is distributed by cc-by-sa or GFDL license in accordance with the provisions of Wikipedia.
In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.
0 개의 댓글:
댓글 쓰기