Ontario power generation

Ontario power generation

Ontario power generation
Company form State-owned enterprise
Type of industry Generation
The establishment 1999
The headquarters Canada Ontario Toronto
Representatives Jeff Lyash – President and CEO, Bernard road – Chairperson
Product Electricity
Sales amount Increase 4,730 million CAD (2012) [1]
The number of employees 10,840 (2012)
Website www.opg.com
I display a template
A headquarters building of the Ontario power generation in the Toronto center.
Mitsubishi, i-MiEV which was exhibited by Montreal World Motor Show of 2011. Canadian hydraulic power generation-related companies such as Ontario power generation, hydroQuebec, BC Hydro exhibited jointly.

The Ontario power generation (Ontario Power Generation, OPG) is the public enterprise which Canadian Ontario state government owns [2] and supplies approximately 50% of electricity of Ontario [3]. The energy source is atomic energy, waterpower, the velocity of the wind, gas heat, biomass. The electricity market of Ontario is liberalized, but Ontario state government owning OPG is a part of the valorization; an electric bill of OPG of the market regulate it to become below the average. Ontario energy Committee (English version) is in charge of regulation from April 1, 2008.

Table of contents

History

OPG was established by the deregulation of the electricity market of the state which Ontario prime minister Mike Harris (the Canadian Progressive Conservative Party) at the time promoted in April, 1999. Along privatization plan of the Ontario high mud (English version) that a state government planned (I divide it into five companies), OPG succeeded proprietary rights and the use of all power stations of the Ontario high mud.



Head office

  • Ontario Power Building, 700 University Avenue, Toronto, ON M5G 1X6. Tel. (416) 592-2555.

Power station

 
R, H Sanders power station. Output 1045MW. It is in the St. Lawrence banks of a river.
 
Old watermill in the D Shoo waterfall
 
Thunder Bay power station

The main power supply of OPG holds the velocity of the wind and the biomass with three kinds of atomic energy, waterpower, heat a little. I generated electricity in 60% of electricity of Ontario, 82.2 TWh in 2014.

Power station - capacity of OPG and output (2014)[4]
Power supply The number of the power stations Generation capacity (MW) Output (TWh) of 2014
Atomic energy 2 6,606 48.1
Waterpower 65 6,426 31.3
Heat and others 5 4,027 2.8
The total 72 17,059 82.2

The Bruce Nuclear Power Plant is the world's largest in the radix of a radix, the nuclear reactor operating of outbreak electric energy, the installed nuclear reactor. It is careless, but, as for 60% of electricity of Ontario, will be generated electricity at three nuclear power plants (Pickering, Darlington, the blues). The serious accident about atomic energy is not taking place in Ontario.


Nuclear power plant

Hydroelectric power station

  • Auburn (adult B river)
  • Big チュート (the Severn)
  • Big Eddie (マスコーカ river)
  • Bingham チュート (south river)
  • Co-varnish ton (ワナピティ river)
  • Christa Le Fort's (Sturgeon river)
    • I generate electricity in 127MW in total in 29 places.

Thermal power station

during the operation

  • アティコーカン (211 MW, coal) - I am switching it to biomass
  • Lamb ton (950 MW, coal) - Closedown
  • ナンチコーク (2.760 GW[5], coal) – A North America's biggest coal-fired station. During a present stop two engines for a fuel switch under equipment maintenance
  • Thunder Bay (303 MW, coal) - I am switching it to biomass – Thunder Bay
  • Lennox (2.140 GW, oil / natural gas)

A shutdown or dismantling

  • Lake view – Shutdown (2.400 GW, coal) – ミシサガ
  • ウェスレイヴィル - construction cancellation (in the early 1960s only as for the plan, the site acquisition)
  • Hahn – Only as for the core facilities removal (the building exists) (1.200 GW, coal) – Toronto

Coownership

  • Brighton beach power station (580 MW, natural gas) - OPG and a coownership of the ATCO power. The driving is Coral energy Canada.
  • Port orchids energy center (550 MW, natural gas) - A coownership of OPG and the trans Canada energy. I transmit electricity in June, 2008 and start.

Other

  • Three wind turbines (for the blues in two engines, Pickering one engine.7 MW in total)
  • Two places of biomass power stations (6 MW)

Footnote

Allied item

Outside link

This article is taken from the Japanese Wikipedia Ontario power generation

This article is distributed by cc-by-sa or GFDL license in accordance with the provisions of Wikipedia.

Wikipedia and Tranpedia does not guarantee the accuracy of this document. See our disclaimer for more information.

In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.

0 개의 댓글:

댓글 쓰기