Flat good harbor
The flat good harbor (ひららこう) is an important harbor in Miyakojima-shi, Okinawa. The harbor manager is Miyakojima-shi. It is port of center of Miyako Islands.
Table of contents
Summary
Is old; called 漲水泊, 漲水港 [1]. I consist of three districts of Shimosaki district, 漲水 (I swell and do not see it) district, the toe river district sequentially from the north. In addition, I fall silent and パイナガマビーチ is located Shimosato ship between 漲水地区 and the toe river district Nikadori (にかどり) fishing port between 漲水地区 with Shimosaki district [2].
Of these, 漲水地区 is the center of freight and the passenger boat departure and arrival now in a district developed for a long time. I have four wharfs of the first -4 wharf to the south from the north. In addition, the facilities of Miyakojima Malin terminal, マティダ citizen Theater, ホテルアトールエメラルド Miyakojima are established along National highway No. 390, too [3].
Shimosaki district of the north sides is a district developed as a new physical distribution base breaking up distribution to be concentrated in 漲水地区 in correspondence with freight increase and upsizing of the liner [4].
In the toe river district of the south side, the Kostal resort maintenance project that コースタルリゾートヒララ and a tentative name were added to is pushed forward [5].
From a flat good harbor, a liner to Taramajima goes into service in Miyako Islands. There was a regular line between the Sara Beach Port of Irabujima, but was abolished with the Irabu Ohashi opening to traffic on January 31, 2015 once on the same day [6]; [7]. On the other hand, the transfer of three bus routes was enabled three carryalls of Miyako Kyoei bus, Yachiyo bus, the Kyowa bus in entry of, a flat good harbor in a flat good harbor by each route on February 1, the following day [8]; [9] [10].
In addition, between Miyakojima and Ikemajima, Kurimajima, Ohashi between the pond, next interval Ohashi appear each, and a liner goes into service from the Shimajiri district in northern Miyakojima between Ogamijima.
History
- - breakwater, landing ground, a road is developed land for (1913) in 1913, and a barge of around 50 tons becomes available [11].
- A Nishisato merchant corps including - Uehara goodness fills up projection personality (1913) in 1913, and construction is begun [12].
- I construct - landfill (1921) on November 25 in 1921 and am completed [12]
- The pier which is available for the coming alongside the pier of the -1000 tons grade ship (1953) is completed in 1953 [11].
- I am appointed (1958) in the important harbor in 1958 by - Ryukyu government, and a name is considered to be a flat good harbor formally [1].
- - breakwater is completed (1966) in 1966, and the coming alongside the pier of the 2,000 tons grade ship is enabled [11].
- I am appointed with - mainland return (1972) in the important harbor on May 15 in 1972 by Japanese Government [11].
- The third wharf which a -5000 tons grade ship can use (1976) on October 21 in 1976 is completed [11].
- The first wharf mainly on - dangerous materials handling is completed (1982) on May 8 in 1982 [1].
- The second wharf including -10,000 tons grade Bath is completed (1985) on September 3 in 1985 [1].
- I devise - Kostal resort plan (1990) in November in 1990 [1].
- Kostal resort business starts work (1993) in - toe river district on May 12 in 1993 [11].
- The fourth wharf for - remote island liner and Malin terminal are completed (1996) in May in 1996 [1].
- - toe river district some (marina part) service starts (1998) on October 12 in 1998 [11].
- - fourth Wharf floating pier service starts (1999) on April 2 in 1999 [1].
- I offer it open, and the Shimosaki Wharf who can use a -12,000 tons grade ship (2008) in May in 2008 starts [11].
Main facilities
Shimosaki district
Shimosaki Wharf
- A May, 2008 in-service start. Other than a cargo boat, it is used for the calls at a port of the irregular cruise passenger boat [13].
漲水地区
The first wharf
- The dangerous materials handling is the center
The second wharf
- Marine transportation - car ferry "ferry たらまゆう" between Tara (one flight a day)
The third wharf
| References and the source which I can inspect are not shown at all, or this gnarl is insufficient. You add the source, and please cooperate with the reliability improvement of the article. (January, 2014) |
- Ryukyu marine transportation (carriage of goods) - "do not go to the Chinese chives" "kariyushi" "みやらび II" (the business abolition passenger on September 18, 2006)
- Fukuoka → Naha → Miyako → Stone wall → Naha
- Tokyo → Osaka → Kagoshima → Naha → Miyako → stone wall → Naha
- Fukuoka → Naha → Miyako → stone wall → Naha
- Arimura industry (Okinawa car ferry) - "Cruise ferry enlightened emperor" "enlightened emperor 21" (navigation stop, the Arimura industry go bankrupt from June 6, 2008)
The fourth wharf
- Miyako ferry - car ferry "ferry Mutsu that says" (six flights a day) - high speed passenger boat "うぷゆう" (11-12 flights a day)
- Hayate - car ferry "ferry Hayate" (seven flights a day) - high speed passenger boat "superliner Hayate" (10-11 flights a day)
- - Irabujima, Sara Beach Port (the time required: by a car ferry for approximately 25 minutes in / high speed passenger boat for approximately 15 minutes) (abolish it on January 31, 2015)
Toe river district
Miyakojima コースタルリゾートヒララ (tentative name)
Footnote
- It is Masaru Nakasone two, all according to the port and culture archives, all the public foundations and a synthesis study foundation "all and culture" of the ^ a b c d e f g Hirara Port (PDF)
- Maintenance plan Ministry of Land, Infrastructure and Transport Hirara harbor office of the ^ Hirara Port
- ^ 漲水地区国土交通省平良港湾事務所
- ^ Shimosaki district Ministry of Land, Infrastructure and Transport Hirara harbor office
- ^ Miyakojima コースタルリゾートヒララ (tentative name )| Administrative information Miyakojima-shi
- The Ohashi opening to traffic, a city are ex gratia payment Ryukyu Shimpo, December 13, 2013 to ^ Miyako ferry and Hayate, the Irabu route abolition
- It is curtain Ryukyu Shimpo, December 13, 2014 by the abolition Ohashi opening to traffic for a history in ^ Irabu route next month
- It is new route / route bus three Miyako Mainichi Shimbun, January 22, 2015 from ^ next month 1
- It is Miyako Courier such as new route start Ohashi opening to traffic alignment extension, January 23, 2015 from ^ bus route February
- ^ route bus three mutual entry start Miyako Mainichi Shimbun, February 2, 2015
- History of ^ a b c d e f g h Hirara Port Ministry of Land, Infrastructure and Transport Hirara harbor office
- ^ a b Hirara-shi history editing Committee "1 Hirara-shi history Vol. 1 complete history prehistory - modern time edition" P.396, Hirara City Hall, 1979
- ^ Hirara Port Shimosaki Wharf is expectation Ryukyu Shimpo, May 25, 2008 for in-service start distribution efficiency
- ^ Miyakojima Kostal resort Hira llama phosphorus leisure Miyakojima-shi
- ^ Miyakojima コースタルリゾートヒララビーチ, facilities ridge Miyakojima-shi
Outside link
This article is taken from the Japanese Wikipedia Flat good harbor
This article is distributed by cc-by-sa or GFDL license in accordance with the provisions of Wikipedia.
In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.
0 개의 댓글:
댓글 쓰기