It is started (1889) with Koiwasawa-mura, Kawatoi-mura, Motonakayama-mura, an area of Nakayama-mura on April 1 in 1889 by the enforcement of - municipality organization.
It merges with - Akayu-cho (1955) on June 10 in 1955, and Akayu-cho starts some other time. The same day Nakagawa-mura abolition.
Some old village level (larger section of a village Nakayama) are admitted into Kaminoyama-shi (1957) in - Akayu-cho on March 21 in 1957.
In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.
The town of approximately 24,000 population that Yamagata is southeastern in Takahata-machi (I wait for Takahata). I belong to Higashiokitama-gun. I am known as a prosperous town of the agriculture including the best grape 〈 Delaware amount of production in Japan 〉.
[the first generation] Xinye Kokichi (from November, 1954 to October, 1978)
[two generations] Sukezo Shimazu (from October, 1978 to April, 1994)
[three generations] Yoshimasa Takanashi (from April, 1994 to April, 2002)
[four generations] Akira Watanabe (from April, 2002 to April, 2006)
[five generations] Sagae sincerity (as of April, 2006 ...)
Takahata-machi assembly
15 member of the Diet fixed number (August, 2015)
The budget for town (2015 original budget)
* General account 10,890 million yen
* Special accounts 6,919,160,000 yen
* Corporate accounting 3,829,520,000 yen
21,638,680,000 yen in total
The number of the staffs of the town (April, 2015)
○218 members of general office work
* 154 hospital personnels
History
Before the Meiji Restoration
689 years (Emperor Jitou three years) 国優嗜曇郡 (うきたむのこおり) of the Tadashi Jito Michinoku.
712 years (Wado five years) a country of Dewa 建置 (the Oitama county is subordinate).
It is "Yashiro" and specification in one which divides a country of Dewa into 11 counties in an Engi era type (Engi era five years) for 927 years, and did Oitama county of those more for seven minutes.
Hiraizumi Fujiwara possesses Michinoku Dewa (Juei era two years) in 1083 and rules this ground for approximately 100 years.
Oe becomes Oitama hundreder well Zhuang (whole Oitama) lord of a manor (Kenkyu era three years) in 1192 and rules for 140 years.
Masashige Kusuki gives Dewa country Yashiro Zhuang to the Emperor Godaigo (Kenbu era two years) in 1335.
伊達宗遠 defeats Nagai (south morning natural gifts six years) in 1380 and is ruled over Date for 212 years.
移封, Ujisato Gamo govern it to Iwate Yamashiro Masamune Date (Tensho era 19 years) 1591 (seven years).
Kagekatsu Uesugi of Echigo is enfeoffed as Aizu (Keicho era three years) in 1598, and Kanetsugu Naoe possesses Date, Nobuo, Yonezawa.
It is done 減封, and Kagekatsu Uesugi joins the club after the Battle of Sekigahara (Keicho era five years) in Yonezawa in 1600.
It is him, the Shogunate direct control for 1,689 years when in eyes cheap caretakers of the Yashiro volost 30,000 stone (Genroku era two years).
The Yashiro volost becomes the governor-general of the Kanto area place of the Uesugis (Kanpo two years) in 1742.
移封, Yashiro volost are divided into two by Takahata, and Oda is governed by Oda and Uesugi (Meiwa four years) in 1767.
Oda is 移封 (Tenpo era two years) in Tendo for 1,831 years.
A part (14 カ villages) of the Yashiro volost becomes the Shogunate direct control (Meiwa seven years) in 1770 (six years).
The Shogunate manages directly (Yasunaga five years) 10 カ villages 1776 (eight years).
Kashiwakura encampment handling (four years) (Tenmei era four years) best 1784 10 カ villages.
The Yashiro volost becomes the Uesugi rule three times (generous politics three years) in 1791 (76 years).
All Yashiro volost becomes the Uesugi territory (1866) in 1866.
It is Restoration of the Imperial rule (1867) for 1,867 years.
Takabata-mura ← Takahata-mura, Akutsu village, Kogooriyama-mura, Takayasu-mura, Izumioka-mura, Shionomori-mura, Hara-mura
Niijuku-mura ← Niijuku-mura
It is Satomura in Sawamura, Fukanuma-mura, Ipponyanagi-mura, Sanjonome-mura, Kawanuma-mura, Kashiwagime-mura, Ainomori-mura at Yashiro-mura ← bamboo Morimura, Negishi-mura, time
Kameoka village ← tortoise Okamura, Tsuyufuji-mura, Iriuda-mura, Funabashi village
Wada-mura ← Motowada-mura, Kamiwada-mura, Shimowada-mura, horse-headed demon village, Sazawa-mura
Nukanome-mura ← Osonozuka-mura, Kamihirayanagi-mura, faucet village, Natsumo-mura, fortune Sawamura, stone Okamura, Ohashi-mura, Yamasaki-mura
- Takabata-mura becomes town organization enforcement, Takabata-cho (1895) on December 12 in 1895.
- Takabata-cho becomes changing of a name, Takahata-machi (1905) in January in 1905.
Nichiden Takahata mill (のちの Yamagata NEC existing: ASE Japan) which became the pioneer of the company invitation in - Yamagata in June Co., Ltd. establishes it [1].
July - whole country pet memorial service festival (shrine of the dog)
August - まほろば kappa festival (station square mall), roadside station Takahata Festival: Welcome back I enshrine oldness and a fair, a green bamboo lantern [2]
September - Akutsu Yawata Shinto shrine autumn festival, the Takahata road race and まほろば marathon meet (Takahata-machi government office)
History of Yamagata community development making secretariat "history of Yamagata community development first book Yamagata staff training institute sequel to", 1998.
In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.
I was appointed [3], and all sections would be placed as the section where Showa ... valley which was non-industrialization section till then, Nozoki - Kamiinnai interval, 3 sections between the Shimoinnai - Ogachi Komachi performed "an investigation to push forward an evaluation for a plan stage" in 2013 than investigation section and were undertaken an enterprise each as Kanayama, Shinjo road, Yokobori road in 2015 when, of these, they were accompanied between Showa ... money of valley, Shimoinnai - Ogachi Komachi [4].
In addition, Tohoku Chuo Expressway does not have the rest area where a service station is installed in.
IC in IC - Lower House in the National highway No. 13 in-hospital road Upper House
IC - Ogachi Komachi IC in the National highway No. 13 Yokobori road Lower House
National highway No. 13 Yuzawa Yokote road Ogachi Komachi IC - Yokote IC
including the interchange
There is the section that the background color of the IC number column is ■ in an existing opening to traffic section. The section that the background color of the facilities column is ■ corresponds to non-opening to traffic section or non-in-service facilities.
Because it is not the main line, in the Fukushima JCT tollgate interval, the kilometer post which is on the main line is not established, and Fukushima JCT tollgate is installed in the starting point from Fukushima JCT by 50KP.
Because the kilometer post of National highway No. 13 is established, the kilometer post from Obanazawa IC and to the north is not clear for the kilometer post of Tohoku Chuo Expressway.
History
It is a degree (1984) for 1,984 years: Yokote south bypass (8.6km) undertakes an enterprise [32].
It is a degree (1985) for 1,985 years: Yuzawa bypass (9.0km) undertakes an enterprise [32].
It is a degree (1986) for 1,986 years: Obanazawa Shinjo road undertakes an enterprise [33].
September 1 : By some revision of the country development main line Expressway construction method, Soma-shi - Yokote-shi becomes the planned route of the country development main line Expressway as Tohoku Chuo Expressway [36]. I change the business name to the Yuzawa Yokote road at Yokote south bypass and Yuzawa bypass [32].
December 3 : A maintenance plan between Yamagata Kaminoyama - Higashine is decided [38]; [41].
December 20 : Fukushima - Yonezawa north interval and Murayama - Obanazawa interval become the basic plan section [38]. Takahata-machi - Obanazawa-shi is appointed as Tohoku Chuo Expressway Takahata Obanazawa flight as Tohoku Chuo Expressway Fukushima Yonezawa flight each Fukushima-shi - Yonezawa-shi by a national highway [42].
It is November 19 (1993) for 1,993 years: An enforcement order between Yamagata Kaminoyama - Higashine is given [38]; [41].
It is November 22 (1994) for 1,994 years: Jumonji IC - Yokote IC interval of the Yuzawa Yokote road is inaugurated [40].
It is a degree (1995) for 1,995 years: City planning between the Yonezawa - Yonezawa north is decided [43].
It is a degree (1996) for 1,996 years: Fukushima - Yonezawa interval and city planning between Higashine - Obanazawa are decided [44]; [45]. 主寝坂道路 undertakes an enterprise [46].
May : City planning between Takahata, Nanyo - Ueyama is decided [39].
December 27 : Fukushima - Yonezawa interval and a maintenance plan between Higashine - Obanazawa are decided [38].
1997 (1997)
February 5 : The Yonezawa - Takahata interval of the Yonezawa Nanyo road becomes the basic plan section [38]. As Tohoku Chuo Expressway Soma Obanazawa flight, Soma-shi - Obanazawa-shi is appointed in a national highway [47].
June 26 : Yuzawa IC - Jumonji IC interval of the Yuzawa Yokote road is inaugurated [40].
November 21 : Yonezawa north IC - Takahata, Nanyo IC interval of the Yonezawa Nanyo road is inaugurated [38].
It is a degree (1998) for 1,998 years: Fukushima - Yonezawa interval undertakes an enterprise [44].
December 25 : An enforcement order is given between Fukushima - Yonezawa, and a maintenance plan between Yonezawa - Yonezawa north is decided [48]. A maintenance plan between Takahata, Nanyo - Yamagata Ueyama is decided, and Higashine - Obanazawa interval undertakes an enterprise [38]; [39] [45].
April 16 : The city planning of the Shinjo north road is decided [49]; [50]
November 27 : Dokusawa temporary doorway (existing Kawarago IC) - Shinjo IC interval of the Obanazawa Shinjo road is inaugurated [38].
December 24 : A maintenance plan between the Fukushima JCT - Yonezawa IC (existing Hachimanpara, Yonezawa IC) is changed, and Ozaso IC (existing Ozaso, Fukushima IC) is added [48].
It is a degree (2000) for 2,000 years: Shinjo north road undertakes an enterprise [50]. I start construction of 主寝坂道路 [46].
It is a degree (2001) for 2,001 years: I start the site purchase between the Fukushima JCT - Yonezawa IC (existing Hachimanpara, Yonezawa IC) [44].
It is September 16 (2002) for 2,002 years: Yamagata Kaminoyama IC - Higashine IC interval is inaugurated [38]; [41].
It is a degree (2003) for 2,003 years: Yonezawa - Yonezawa north interval undertakes an enterprise and becomes the new direct control method [43]. I start the site purchase of the Shinjo north road [50]. An in-hospital road undertakes an enterprise [51].
March : Poor construction is found out in the Funagata tunnel of the Obanazawa Shinjo road, and one side traffic and full-scale suspension of traffic are repeated between Dokusawa temporary doorway (existing Kawarago IC) - Funagata ICs for repair construction until December of the year.
It is a degree (2004) for 2,004 years: I start the construction between the Fukushima JCT - Yonezawa IC (existing Hachimanpara, Yonezawa IC) [44].
January 30 : An enforcement order appears between Fukushima JCT - Yonezawa ICs (existing Hachimanpara, Yonezawa IC) (1998) on December 25 1998, but is withdrawn, and it is a new direct control method [38]; [48] [52].
March 18 : I abolish a tollgate in Yuzawa IC of the Yuzawa Yokote road and transfer it in the Jumonji Main Line tollgate.
April : An Abukuma way to the east road undertakes an enterprise [53].
July 28 : Mitsuseki IC - Yuzawa IC interval of the Yuzawa Yokote road is inaugurated [40].
It is a degree (2006) for 2,006 years: I start the site purchase between the Soma west IC - Abukuma east IC of the Abukuma way to the east road [53]. I start the site purchase between the Higashine IC - Obanazawa IC [45].
February 7 : Higashine IC - Obanazawa IC interval becomes the new direct control method [56]; [57].
March: A valley undertakes an enterprise in Takahata, Nanyo - Yamagata [39].
August 5 : Sugawa IC - Mitsuseki IC interval of the Yuzawa Yokote road is inaugurated [40].
November 19: Nokurosawa IC - Dokusawa temporary doorway (existing Kawarago IC) interval of the Obanazawa Shinjo road is inaugurated, and it is made an interchange, and Dokusawa temporary doorway becomes Kawarago IC [58].
It is a degree (2007) for 2,007 years: I start the construction between the Soma west IC - Abukuma east IC of the Abukuma way to the east road [59]. I start the site purchase between the Yonezawa IC (existing Hachimanpara, Yonezawa IC) - Yonezawa north IC [43]. I start the construction between the Higashine IC - Obanazawa IC [45]. I start the site purchase and the construction of the in-hospital road [51].
August 26 : The Ogachi Komachi IC - Sugawa IC interval of the Yuzawa Yokote road is inaugurated, and the whole line is inaugurated Yuzawa Yokote road [40].
September 29 : I start the construction between the Higashine IC - Obanazawa IC [61].
It is a degree (2008) for 2,008 years: I start the construction between the Yonezawa IC (existing Hachimanpara, Yonezawa IC) - Yonezawa north IC [43].
March 30 : A holiday doorway (existing outside swamp IC) interval out of Yamakita IC ... of 主寝坂道路 is inaugurated, and it is made an interchange, and a middle holiday doorway becomes outside swamp IC [62].
August 1 : The groundbreaking ceremony of the Abukuma way to the east road is held [63].
It is March (2009) for 2,009 years: A sacred mountain road undertakes an enterprise [53].
It is a degree (2010) for 2,010 years: I start the site purchase between the Abukuma IC - sacred mountain IC of the sacred mountain road [53].
March: I start the site purchase between the Takahata, Nanyo IC - Yamagata Kaminoyama IC [39].
June 28 : Yonezawa north IC - Takahata, Nanyo IC interval, Yamagata Kaminoyama IC - Higashine IC interval, Yuzawa IC - Yokote IC interval become the object section of the expressway charge-free society experiment each [64].
2011 (2011)
March 11 : By the 2011 off the Pacific coast of Tohoku Earthquake (the Great East Japan Earthquake), Yonezawa north IC - Takahata, Nanyo IC interval, Yamagata Kaminoyama IC - Higashine IC interval, Yuzawa IC - Yokote IC interval are closed to traffic at one time [65].
March 26 : Shinjo IC - Shinjo north IC interval of the Shinjo north road is inaugurated [66].
April: I start the construction between the Takahata, Nanyo IC - Yamagata Kaminoyama IC [39].
June 20 : Because the government serves restoration, a revival expense of the Great East Japan Earthquake, expressway charge-free society experiment is finished once at 0:00 and is frozen up at one time [67]. For the purpose of victim support caused by the Great East Japan Earthquake, restoration, a reconstruction aid, measures that it is free in a pike are started for some vehicles each between Yonezawa north IC - Takahata, Nanyo IC interval that is paid section, Yamagata Kaminoyama IC - Higashine IC interval, Yuzawa IC - Yokote IC [68].
August 31 : For the purpose of restoration, a reconstruction aid caused by the Great East Japan Earthquake, measures that it is free finish a pike for some vehicles [68].
November : The Soma west road of the Fukushima, Soma road and Abukuma east - Abukuma interval undertake an enterprise [53].
November 26 : A revival road start of construction expression is held [69].
November 30: For the purpose of victim support caused by the Great East Japan Earthquake, measures that is free finish a pike for some vehicles [68]; [70].
December 1 : For the purpose of sightseeing promotion caused by the Great East Japan Earthquake, I carry out measures that it is free in (ETC deployment car-limited) such as the common car, light car of Saturdays, Sundays, and holidays [71].
It is a degree (2012) for 2,012 years: I start the site purchase between the Soma IC - Soma west IC of the Soma west road [53]. I start the site purchase between the Abukuma east IC - Abukuma IC of the Fukushima, Soma road [53]. Izumita road undertakes an enterprise [72].
March 31 : For the purpose of sightseeing promotion caused by the Great East Japan Earthquake, I finish measures that it is free in (ETC deployment car-limited) such as the common car, light car of Saturdays, Sundays, and holidays [71].
April 20 : Ozaso IC (existing Ozaso, Fukushima IC), Yonezawa center IC, Higashine north IC (tentative name), Murayama north IC (tentative name), Oishida, Murayama IC (existing Oishida Murayama IC) connect it each, and they are admitted [73].
July 20 : City planning between sacred mountain - Fukushima of the Fukushima, Soma road is decided [74].
November 27: I start the construction between the Abukuma IC - sacred mountain IC of the sacred mountain road [75].
September 11 : Fukushima JCT - Ozaso, Fukushima IC interval is inaugurated [82].
November 5 : An IC interval in IC - Lower House in the Upper House of the in-hospital road is inaugurated [83].
December 26 : In-service due to begin Yonezawa IC (tentative name), Yonezawa center IC (tentative name), a name of Oishida, Murayama IC (tentative name) are decided formally each in Hachimanpara, Yonezawa IC, Yonezawa center IC, Oishida Murayama IC in 2017 [16].
March 26 : Soma Yamagami IC - Soma Tamano IC interval of the Fukushima, Soma road (Abukuma way to the east road) is inaugurated [8]; [84].
Route situation
Traffic lane, the maximum speed, rate
It becomes 2 provisional traffic lanes with the whole line, but I overtake it in some sections, and a traffic lane is almost installed. In addition, the neighborhood of each main line tollgate becomes 40km/h.
Section
Traffic lane The up and down line = up line + down line
Yonezawa north IC - Takahata, Nanyo IC (Yonezawa Nanyo road)
70km/h
Pay
Yamagata Kaminoyama IC - Higashine IC
Obanazawa IC - Shinjo IC (Obanazawa Shinjo road)
Free of charge
Shinjo IC - Shinjo north IC (Shinjo north road)
Yamakita - Nozoki Kim (主寝坂道路)
Ogachi Komachi IC - Yuzawa IC (Yuzawa Yokote road)
Yuzawa IC - Yokote IC (Yuzawa Yokote road)
Pay
Main tunnel and bridge
The section that a background color is ■ corresponds to non-opening to traffic section. Name of non-opening to traffic section and all the structure tanka with a thing's name in it are tentative names.
Section
Structure tanka with a thing's name in it
Length
Up line
The down line
Soma IC - Soma Yamagami IC
Wild Yashiki Bridge
178m
Imada viaduct
785m
Mt. Shiode tunnel
1,801m
Japanese yen edge tunnel
963m
Soma Yamagami IC - Soma Tamano IC
楢這 tunnel
1,492m
荻平 tunnel
1,023m
Pine ヶ bunch tunnel
1,319m
Tamano Tunnel
968m
Abukuma IC - holy mountain IC
Shoji edge tunnel
929m
Waist circulation tunnel
889m
Gold valve storehouse tunnel
626m
Treasure direct tunnel
161m
Seven 窪 tunnels
1,404m
Horse Tateyama tunnel
367m
Boundary ノ eyes tunnel
175m
Holy mountain IC - Tamotsu Fukushima initial side IC
Kakeda tunnel
421m
Tomizawa tunnel
433m
上保原 tunnel
305m
Tamotsu Fukushima initial side IC - National highway No. 4 IC
The section that a background color is ■ corresponds to non-opening to traffic section. All the names of non-opening to traffic section are tentative names.
Section
Up line
The down line
Soma IC - Soma Yamagami IC※
2
Soma Yamagami IC - Soma Tamano IC※
4
Soma Tamano IC - Abukuma IC※
0
Abukuma IC - holy mountain IC※
7
Holy mountain IC - Tamotsu Fukushima initial side IC※
3
Tamotsu Fukushima initial side IC - National highway No. 4 IC※
Because the section of 2 provisional traffic lane (※ seals is two-way traffic of completion 2 traffic lane), it becomes one tunnel in an up and down line.
The Tohoku Chuo Expressway aerial photography that construction advances to around a lake (Mizukubo dam lake) of the fertility of the suburbs of Yonezawa-shi
^"way of thinking (PDF) of the choice of the new business candidate point." It is p. a Ministry of Land, Infrastructure and Transport Tohoku district maintenance station road part 2 (March 4, 2015). October 22, 2015 reading.
^ abc"Opening to traffic target". A revival road, a reconstruction aid road information site. A Ministry of Land, Infrastructure and Transport Tohoku district maintenance station road part. May 17, 2015 reading.
^"Tohoku Chuo Expressway (Fukushima - Yonezawa)(PDF)". Ministry of Land, Infrastructure and Transport Tohoku district maintenance station Yamagata river national highway office. October 19, 2015 reading.
^"Tohoku Chuo Expressway (Higashine - Obanazawa)(PDF)". Ministry of Land, Infrastructure and Transport Tohoku district maintenance station Yamagata river national highway office. October 21, 2015 reading.
^ ab"... Saturday, March 26 opening to traffic ... (PDF) that National highway No. 13 Shinjo north road is inaugurated." It is p. Ministry of Land, Infrastructure and Transport Tohoku district maintenance station Yamagata river national highway office 2 (February 28, 2011). February 23, 2017 reading.
^"National highway No. 13 Izumita road(PDF)". Ministry of Land, Infrastructure and Transport Tohoku district maintenance station Yamagata river national highway office. February 24, 2017 reading.
Government ordinance (1997 government ordinance twelfth) which revises a part of the government ordinance appointing the route of the ^ national highway
^ abc"The Tohoku Chuo Expressway Fukushima - Yonezawa north(PDF)". It is p. Ministry of Land, Infrastructure and Transport Tohoku district maintenance station Fukushima river national highway office / Yamagata river national highway office 1. March 4, 2016 reading.
^"... Saturday, March 26 opening to traffic ... (PDF) that National highway No. 13 Shinjo north road is inaugurated." It is p. Ministry of Land, Infrastructure and Transport Tohoku district maintenance station Yamagata river national highway office 3 (February 28, 2011). March 5, 2016 reading.
^"2015 duties summary(PDF)". It is p. Ministry of Land, Infrastructure and Transport Tohoku district maintenance station Iwaki national highway office 45 (July 7, 2015). March 4, 2016 reading.
^"reference materials -2" (PDF). It is p. East Nippon Expressway Tohoku branch office Co., Ltd. 2 (August 11, 2011). March 10, 2016 reading.
^"... Saturday, March 26 opening to traffic ... (PDF) that National highway No. 13 Shinjo north road is inaugurated." Ministry of Land, Infrastructure and Transport Tohoku district maintenance station Yamagata river national highway office (February 28, 2011). March 5, 2016 reading.
I put 4 bridges of the ^ abcdnew elder swamp 1 bridge ... new elder swamp 4 bridge together and say with new elder swamp Bridge. "The Tohoku Chuo Expressway Fukushima - Yonezawa north(PDF)". It is p. Ministry of Land, Infrastructure and Transport Tohoku district maintenance station Fukushima river national highway office / Yamagata river national highway office 2. November 15, 2015 reading.
In addition, Tranpedia is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.