Hiroshima Expressway 2
|This article is not shown at all or insufficient. Please cooperate in improving the reliability of the article. (May 2013) — | —
Hiroshima High-speed Line 2(Hiroshima So-sky 2 Genshoken) is from Hiroshima Prefecture to Hiroshima City (city highway).
() - -
Hiroshima Express 2 Line Hiroshima Prefectural Highway No. 473 Fuchu Inosho Line Map Route extension | 5.9 Opening year | Starting point | () main Via city | Hiroshima Hiroshima, Hiroshima Prefecture End point | Hiroshima Prefecture Hiroshima-shi Minami Ward () Connecting Main road () | E31
Template (How to use) WikiProject Road
Cross the Sarugawa River
Near insurance 2 chome
Nishi 4-chome near
table of contents
Overview
(Former · Aki Fuchu Road, warm bypass) and · (·). Also called Fuchu Hinjo Road (fumble bunsharo). All sections It is designated as Hiroshima Prefectural Highway No. 473 Fuchu Ninbo Line(Hiroshima Prefecture 473 fumble).
Although it opened all the routes at the same time in 2010, it runs in parallel with and - during the immediate provisional use with the completion of two lanes for the time being.
Almost parallel all along the Wen Shinagawa and parallel. At the time of construction of the Hiroshima Expressway 2, there was also a story to relocate the national approach close to the elevated bridge girder, but now the discussion on relocation remains blank.
: Class 2 Class 2 () Design speed: 60 Road width Elevated part: 17.50 (4 lanes) (Section 10.50 m) Width: 3.5 m * Number of lanes: 4 lanes (provisional 2 lane section about 1.8)
Overview as a prefectural road
- Origin: Hiroshima Prefecture Hiroshima-shi Higashi-ku Warmer ()
- End point: Hiroshima Prefecture Hiroshima-shi Minami-ku Nishi ()
- Total extension: 5.9 km
Connecting highway
- (Connect with)
- (Connected with hot product JCT: under project)
- (Connection with hot product JCT: planned)
- (Connect with)
- E31 (connected with Jinbo JCT)
- (Connected by Jinbo JCT)
Entrance and exit
- The part where the background color of the facility name column is (1) indicates that the facility is not used or is not completed.
Facility name | Connection route name | From the starting point () | Remarks | Location — | — | — | — | — (Concept) | (In business) | 0.0 | Routing connection with Highway No. 5 is serviced | | | | Jinto JCT direction gateway only | | | For hot items JCT direction only gateway | Fuchu-cho | | | Nishi JCT direction gateway only | Hiroshima-shi | () | | Warm product JCT direction gateway only | | | Jinto JCT direction gateway only | | 5.9 | E31
history
*: Started service as part of opening of hot products JCT - Jinbo JCT (partly provisional 2 lanes). At the same timeFull Line Opening.
Traffic volume
24 hour traffic volume(units)
Section | Heisei 22 (2010) Fiscal Year | Heisei 27 (2015) Year |
---|---|---|
Between entrance / hot product JCT - Yaga gateway | 11, 122 | 17, 812 |
Yaga entrance - Fuchu entranceway | 12, 422 | 19, 772 |
Fuchu entrance - Ozu gateway | 9, 640 | 15, 125 |
Daejeon entrance - Shinonome gateway | 12, 129 | 20, 587 |
Shinkansen entrance - Nishio gateway | 8, 775 | 15, 131 |
Nisho entrance - Jinto JCT | 40, 846 | 37, 048 |
(Source: created by extracting some data from "" · "" (homepage))
Related item
- *
External link
This item is related to***. I will do (/). — | —
About****:
Acquired from ""
Post Date : 2018-02-24 02:00
This article is taken from the Japanese Wikipedia Hiroshima Expressway 2
This article is distributed by cc-by-sa or GFDL license in accordance with the provisions of Wikipedia.
In addition, This site is simply not responsible for any show is only by translating the writings of foreign licenses that are compatible with CC-BY-SA license information.
0 개의 댓글:
댓글 쓰기